Difference between revisions of "Photon Beam Commissioning Discussion Aug 20, 2014"

From GlueXWiki
Jump to: navigation, search
(Created page with "__TOC__ == Organization == * Time: 4 pm EST * Connecting: detailed instructions are here ** H.323 ip address: 199.48.152.152 ** web browse...")
 
(Agenda)
Line 19: Line 19:
 
# Announcements
 
# Announcements
 
# Recommendations from [http://www.jlab.org/Hall-D/halld_secure/reviews/ERR_HallD_Jul2014/Final_Report_HallD_Experiment_Readiness_Review.pdf ERR Report]
 
# Recommendations from [http://www.jlab.org/Hall-D/halld_secure/reviews/ERR_HallD_Jul2014/Final_Report_HallD_Experiment_Readiness_Review.pdf ERR Report]
#* Notes beyond ongoing efforts:
+
# Aug 8 Photon Beam Commissioning Review [http://www.jlab.org/Hall-D/halld_secure/reviews/PhotonBeamCommissioning_Internal_Aug2014/Final_Report/ReportonPhotonBeamCommissioning.pdf Final Report]
#* p2 5b) "...strong suggestion by the committee to install several beam loss monitors inside Hall D proper"
+
# ARR presentations
#* p5 third paragraph proposes "The installation of a few sacrificial SiPMs in the Tagger hodoscope during the remaining beam transport commissioning activities, at the start of the next beam operations period..."
+
# Accelerator and Hall D Interface Document - needs to be finalized.
#* p7 first bullet: "Setup and tuning of photon beam into the experimental area along with monitoring of background and radiation levels. The latter has to be continuously available and cannot rely on the start of the DAQ system."
+
#* p8 under slow controls: "...concerned about... the motor control commissioning... Specific recommendation: Implement limit switches and/or hardware to avoid movable collimator completely out."
+
# Debrief Aug 8 Review:
+
#* [http://www.jlab.org/Hall-D/halld_secure/reviews/PhotonBeamCommissioning_Internal_Aug2014/ Photon Beam Commissioning Review Page]
+
#* [http://www.jlab.org/Hall-D/halld_secure/reviews/PhotonBeamCommissioning_Internal_Aug2014/Final_Report/ReportonPhotonBeamCommissioning.pdf Final Report]
+
#* [[Media:Moteabbed thesis p55-p56.pdf]] Description of TPE photon profile monitor
+
#* Comments / to-do-list for ARR
+
#* ARR presentations
+
# [https://halldweb1.jlab.org/wiki/index.php/Specification_for_12_GeV_electron_beam_and_associated_instrumentation Electron Beam Specifications]
+
#* Need signed document?
+
#* Accelerator and Hall D Interface Document - needs to be finalized.
+
# Update on Electron Commissioning (Todd/Mike)
+
#*Monitoring of photon beam dump?
+
#*Populating Operational Restrictions [http://opsweb.acc.jlab.org/internal/ops/ops_webpage/restrictions/ops_restrictions.html]
+
 
# Update on Photon Commissioning (Alexandre)
 
# Update on Photon Commissioning (Alexandre)
#* Version for the ARR
+
# RadCon update
# Update Radiation monitors and controls (George/Pavel)
+
 
# Other business
 
# Other business
  

Revision as of 17:52, 13 August 2014

Organization

  • Time: 4 pm EST
  • Connecting: detailed instructions are here
  • Conference id: 536076821

References

Action Items

  • Send Todd a geometry of tagger area, including the mapped tagger magnet field, for GEANT simulations (Richard). Richard is working to update the defined geometry based on a drawing received from Tim, Richard will add field map from Dan Sober
  • Estimate rates and ranges of parameters needed for the photon beam tuning (Todd for accelerator; Elton, Hovanes, Eugene, Alexandre for Hall D)
    • Need rates for profiler, start counter, ps

Agenda

  1. Announcements
  2. Recommendations from ERR Report
  3. Aug 8 Photon Beam Commissioning Review Final Report
  4. ARR presentations
  5. Accelerator and Hall D Interface Document - needs to be finalized.
  6. Update on Photon Commissioning (Alexandre)
  7. RadCon update
  8. Other business

Minutes

Attending: