Difference between revisions of "Photon Beam Commissioning Discussion Sep 3, 2014"
From GlueXWiki
(→Action Items) |
|||
Line 15: | Line 15: | ||
** Need rates for profiler, start counter, ps | ** Need rates for profiler, start counter, ps | ||
* Richard will provide a "sacrificial" board with 30 SiPMs to register neutron damage during initial electron beam tune. | * Richard will provide a "sacrificial" board with 30 SiPMs to register neutron damage during initial electron beam tune. | ||
− | * Hovanes is preparing photomultipliers that can be used to measure beam loss along the beamline. | + | * <strike> Hovanes is preparing photomultipliers that can be used to measure beam loss along the beamline. </strike> |
* Complete the tagger layout with the expected configuration for the fall running, including all shielding. (Tim, Chuck, Elton) | * Complete the tagger layout with the expected configuration for the fall running, including all shielding. (Tim, Chuck, Elton) | ||
− | * Circulate the updated version of ICD (Elton) | + | * <strike> Circulate the updated version of ICD (Elton) </strike> |
== Agenda == | == Agenda == | ||
Line 35: | Line 35: | ||
''Attending: | ''Attending: | ||
+ | |||
+ | # Announcements | ||
+ | # Accelerator and Hall D Interface Document - update | ||
+ | ## page 5 yellow highlight: Do we want these references [2...7] or should we update them to more relevant information? See Mike's note in the text. | ||
+ | ## As suggested, I have added Appendix B with the table, prepared by Alexandre and presented at the ERR | ||
+ | ## I have left the comments by Mike with a "?" so that the item can be checked | ||
+ | ## The figures still must be updated to current versions. Please send me an appropriate file if you have it. | ||
+ | ## Appendix A has been updated with the parameters suggested by Richard, although this probably deserves further discussion. Note that the list of parameters (in "green markup by Mike") on the bottom of p 18 were left simply for reference and discussion. After agreement on final numbers, only the values in the tables will remain in the document. | ||
+ | # Update on Photon Commissioning (Alexandre) | ||
+ | # [[Beam Simulations]] | ||
+ | # RadCon update | ||
+ | # Other business |
Revision as of 18:02, 3 September 2014
Organization
- Time: 4 pm EST
- Connecting: detailed instructions are here
- H.323 ip address: 199.48.152.152
- web browser: https://bluejeans.com/536076821
- phone: 408-740-7256 or 888-240-2560
- Conference id: 536076821
References
Action Items
- Estimate rates and ranges of parameters needed for the photon beam tuning (Todd for accelerator; Eugene, Alexandre for Hall D)
- Need rates for profiler, start counter, ps
- Richard will provide a "sacrificial" board with 30 SiPMs to register neutron damage during initial electron beam tune.
-
Hovanes is preparing photomultipliers that can be used to measure beam loss along the beamline. - Complete the tagger layout with the expected configuration for the fall running, including all shielding. (Tim, Chuck, Elton)
-
Circulate the updated version of ICD (Elton)
Agenda
- Announcements
- Accelerator and Hall D Interface Document - update
- page 5 yellow highlight: Do we want these references [2...7] or should we update them to more relevant information? See Mike's note in the text.
- As suggested, I have added Appendix B with the table, prepared by Alexandre and presented at the ERR
- I have left the comments by Mike with a "?" so that the item can be checked
- The figures still must be updated to current versions. Please send me an appropriate file if you have it.
- Appendix A has been updated with the parameters suggested by Richard, although this probably deserves further discussion. Note that the list of parameters (in "green markup by Mike") on the bottom of p 18 were left simply for reference and discussion. After agreement on final numbers, only the values in the tables will remain in the document.
- Update on Photon Commissioning (Alexandre)
- Beam Simulations
- RadCon update
- Other business
Minutes
Attending:
- Announcements
- Accelerator and Hall D Interface Document - update
- page 5 yellow highlight: Do we want these references [2...7] or should we update them to more relevant information? See Mike's note in the text.
- As suggested, I have added Appendix B with the table, prepared by Alexandre and presented at the ERR
- I have left the comments by Mike with a "?" so that the item can be checked
- The figures still must be updated to current versions. Please send me an appropriate file if you have it.
- Appendix A has been updated with the parameters suggested by Richard, although this probably deserves further discussion. Note that the list of parameters (in "green markup by Mike") on the bottom of p 18 were left simply for reference and discussion. After agreement on final numbers, only the values in the tables will remain in the document.
- Update on Photon Commissioning (Alexandre)
- Beam Simulations
- RadCon update
- Other business