== Friday, Dec 6 at 08:45 == | == Friday, Dec 6 at 08:45 == | ||
# Last 24h: | # Last 24h: | ||
Line 69: | Line 47: | ||
#* try to reschedule tagger accidentals | #* try to reschedule tagger accidentals | ||
#* No weekend meetings planned at present | #* No weekend meetings planned at present | ||
+ | |||
+ | == Thursday, Dec 5 at 08:45 == | ||
+ | # Last 24h: | ||
+ | #* Straight tracks during the day, Justin & Sean working to debug recon and analyze the data | ||
+ | #* Sean got the general detector checkout done. | ||
+ | #* Sasha did the PS threshold scan and set up the PS trigger for Richard's uscope scan | ||
+ | #* [https://logbooks.jlab.org/entry/3746828 Sasha set up trigger config for straight tracks] excluding uscope so Richard can work independently | ||
+ | #* Richard's uscope scans half done, interrupted by ghost PSS button press from tagger hall, no beam from approx 9pm - 1am? | ||
+ | #* [https://logbooks.jlab.org/entry/3746870 Lubomir's logentry] | ||
+ | #Issues | ||
+ | #* Solenoid alarm | ||
+ | #* PSS fault | ||
+ | #* GEM cable or module swap | ||
+ | # Plan for today | ||
+ | #* After the meeting (TBD Justin), move GEM to position 2, fix electronics problem, then take more data until ~4pm? | ||
+ | #* Move GEM to position 3, then take more data until ~6am Friday? | ||
+ | # Plan for later | ||
+ | #* [https://halldweb.jlab.org/wiki/index.php/Run_Coordination_Meetings:Fall2019_Run#Runplan Alexandre's comprehensive runplan] now at 3-4 | ||
+ | #Notes from this meeting. | ||
+ | #* Also need to check the GEM readout config | ||
+ | #* Beam time request from David for CPP | ||
+ | #* Radiation levels report from Alexandre | ||
+ | #* Repeated alarms for TAGH 151 |
Revision as of 12:29, 6 December 2019
<- Back to Run Coordination Meetings:Fall2019 Run
- Acc whiteboard
- Counting house whiteboard
- Hall D schedule for week 1
- Hall D schedule for week 2
- BTA guidelines
Friday, Dec 6 at 08:45
- Last 24h:
- Now have enough straight track data for GEM at all 3 positions
- GEM_TRD firmware updated between beam left and beam right running
- FADC replaced on GEM_TRD. Readout issues with GEM_TRD (see Lubomir's logentry).
- Richard started completing the uscope threshold scan ~6am ish - working on this until 11am. Busy (UConn) until 5pm.
- Solenoid is ramping (Tim/Beni)
- Hovanes disabled the alarms on two TAGH channels which have faulty HV boards
- Issues
- Lubomir's logentry, GEM_TRD
- Beni, TOF
- Rootspy (errors, preferred gluon, run #, plots)
- BTA - cannot edit old timesheets
- Reports
- Plan for today
- Start solenoid ramping
- Access at ~11 or when Richard finishes uscope scan
- (Empty target before Richard does tagger accidentals measurement) (postpone these)
- Fill target.
- CDC & TOF scans
- DIRC commissioning field-on
- Opp access request from Sasha 30 mins to replace fcal fadcs, Nick, Colin, Beni...
- Plan for later
- Reschedule tagger accidentals
- Alexandre's comprehensive runplan now at #5
- Spin dance likely Monday or Tuesday. We can have beam for some/most of this time.
- Diamond alignment likely on Wednesday?
- Notes from this meeting.
- Access at 11 for work as above
- Alignment on Saturday as stable beam most likely
- uscope threshold scan top priority
- DIRC commissioning can use amo if necessary
- try to reschedule tagger accidentals
- No weekend meetings planned at present
Thursday, Dec 5 at 08:45
- Last 24h:
- Straight tracks during the day, Justin & Sean working to debug recon and analyze the data
- Sean got the general detector checkout done.
- Sasha did the PS threshold scan and set up the PS trigger for Richard's uscope scan
- Sasha set up trigger config for straight tracks excluding uscope so Richard can work independently
- Richard's uscope scans half done, interrupted by ghost PSS button press from tagger hall, no beam from approx 9pm - 1am?
- Lubomir's logentry
- Issues
- Solenoid alarm
- PSS fault
- GEM cable or module swap
- Plan for today
- After the meeting (TBD Justin), move GEM to position 2, fix electronics problem, then take more data until ~4pm?
- Move GEM to position 3, then take more data until ~6am Friday?
- Plan for later
- Alexandre's comprehensive runplan now at 3-4
- Notes from this meeting.
- Also need to check the GEM readout config
- Beam time request from David for CPP
- Radiation levels report from Alexandre
- Repeated alarms for TAGH 151