Difference between revisions of "Jan 23, 2020 Calorimeter"
From GlueXWiki
(→Action Items) |
(→Action Items) |
||
Line 35: | Line 35: | ||
# Complete [https://halldweb.jlab.org/wiki-private/index.php/2018_Work_Packages#Calorimetry Calorimeter work packages] | # Complete [https://halldweb.jlab.org/wiki-private/index.php/2018_Work_Packages#Calorimetry Calorimeter work packages] | ||
− | [[Long term items]] | + | [[Long term items]] |
= Tentative Agenda = | = Tentative Agenda = |
Revision as of 16:50, 9 January 2020
Meeting Time: 11:00 a.m.
- To join via a Web Browser, go to the page [1] https://bluejeans.com/907185247.
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 907185247.
- To join via phone, use one of the following numbers and the Conference ID: 907185247.
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- Upon connection all microphones are automatically muted. To unmute your mike on a Polycom or equivalent unit, enter *4. Unmuting on a computer is trivial as there is a microphone button than can be clicked.
- More information on connecting to bluejeans is available.
Contents
Participant Direct Lines
- JLab Phone in CC L207 is 757-269-7084 (usual room)
- JLab Phone: in CC F326 is 757-269-6460
- Phone in the Regina Video-conference Suite is 306-585-4204
- Athens Phone: in Christina's office is 011-30-210-727-6947
References
- FCAL HDFCAL log book
- BCAL HDBCAL log book
Goals for Calorimetry Group
- Determine preliminary photon reconstruction efficiencies as a function of E, phi and theta in data and simulation with a point-to-point precision of at least 5%.
- Measure systematics of pi0/eta mass calibration as a function of detector position to a precision of at east 5 MeV.
- Demonstrate agreement of photon reconstruction efficiency and resolution between data and simulation as a function of E, phi and theta to within 5%.
Action Items
- Proposal for updating BCAL gain constants 2019 / extrapolation to higher energy (Karthik)
- Systematically fix labels on FCAL crates (Colin/Elton)
- Ship back bases to IU that fail repair (Colin)
- Order spare FCAL electronics (Elton)
- Complete Calorimeter work packages
Tentative Agenda
- Announcements
- Collaboration Meeting February 13-15, 2020.
- Action Items
- Run Updates
- FCAL
- BCAL
- Calibrations
- Quick look at a few pull distributions (Jon)
- Nonlinearity correction studies An update (karthik)
- Monitoring
- Reconstruction (Mark)
- post processing (non-linearity, covariance matrices)
- Efficiencies
- Simulations
- Geant4 BCAL reconstructed energy bad in runs < 40000? See github issue here (Jon)
- NIM articles
- GlueX-doc-3111 (Mark)
- Any other business
Minutes
Attending: