Difference between revisions of "Run Planning Meeting Notes, Feb 27-Mar 05, 2020"
From GlueXWiki
(→Thursday, February 27) |
(→Thursday, February 27) |
||
Line 10: | Line 10: | ||
#* DIRC LV regulation issue: [https://logbooks.jlab.org/entry/3792445] [https://logbooks.jlab.org/entry/3792450] | #* DIRC LV regulation issue: [https://logbooks.jlab.org/entry/3792445] [https://logbooks.jlab.org/entry/3792450] | ||
#** Conclusion: adding LV regulation to the DIRC todo list. | #** Conclusion: adding LV regulation to the DIRC todo list. | ||
+ | #* [https://logbooks.jlab.org/entry/3793084 Transmission issue] | ||
# Run Plan | # Run Plan | ||
#* No beam 8am-10am , Hall B beam restoration software reset. | #* No beam 8am-10am , Hall B beam restoration software reset. | ||
#* Production | #* Production | ||
− | # Starting with a special HARP scan requested by Hovanes: hall A on at 150nA, 350nA for us, use Tagger_Electron_Left_Halo for analyzing. | + | #* Starting with a special HARP scan requested by Hovanes: hall A on at 150nA, 350nA for us, use Tagger_Electron_Left_Halo for analyzing. |
Revision as of 09:45, 27 February 2020
Thursday, February 27
- Last 24 hours
- Reports/Issues
- Gluon05 monitors
- DIRC root_spy monitoring plot
- DIRC LV regulation issue: [3] [4]
- Conclusion: adding LV regulation to the DIRC todo list.
- Transmission issue
- Run Plan
- No beam 8am-10am , Hall B beam restoration software reset.
- Production
- Starting with a special HARP scan requested by Hovanes: hall A on at 150nA, 350nA for us, use Tagger_Electron_Left_Halo for analyzing.