*Reviewed minutes of last meeting
 
*Reviewed minutes of last meeting
* We looked at Rory's pictures and discussed the 3D model that Stephanie shared
 
* looking at space on platform, we decided to leave the vertical cable managers so we have some space margin in the future
 
* Need to develop a dimensional layout of 3D model  --  Stephanie
 
** Note: The chamber currently in the hall has different thickness dimensions than the new ones
 
** New chambers are 2.09" thick skin to skin
 
* Need to develop an installation procedure  -- Tim/Stephanie
 
* Need to separate the 2 DS chambers for the electronics RF shielding
 
** Rory to supply the gauge and dimensions of the shield
 
** Stephanie to update geometry in 3D model
 
* Floor rail system design needed to allow CPP to move along with the FCAl platform
 
** Tim to supply sketch
 
** Stephanie to create 3D model and drawings
 
* Dark Room Structure
 
** Tim to supply sketch for structural needs
 
** Stephanie to update 3D model and create drawings
 
** New structural members need to be installed before skin removal
 
* Next meeting to be 1:30 to avert a time conflict
 

Revision as of 08:34, 23 April 2020

Meeting Time and Place =

Thursday April 23, 2020, 1:30pm Bluejeans https://bluejeans.com/710246635/3638?src=calendarLink

  • Present - Elton, Dave, Stephanie, Llya, Rory (remote)

Agenda

Minutes and Action Items

  • Reviewed minutes of last meeting