Tagger and Beamline Review
From GlueXWiki
Revision as of 10:02, 9 October 2008 by Jstewart (Talk | contribs) (→Second round of dry runs (week of November 10))
Contents
The Hall D/GlueX Tagger and Beamline Review
- Agenda
- November 19-20 Review Website (halld guest)
- Previous Reviews
Material Prepared for the Review
- Pre-brief Material for the reviewers
- GlueX-doc-1063 GlueX Physics and Detector Performance Metrics
- Final Talks
- GlueX-doc-1xxx GTemplate
Relevant Wiki Pages
- Description Photon Beam
- Biweekly Meetings
- Drawings (Tim)
Dry Run Schedule for the Review
First round of dry runs (week of November 3rd)
- Thursday Nov 6 and Friday Nov 7
- Overview of Hall D Detector E. C. Aschenauer - none
- 12 GeV Electron Beam Y. Roblin - Nov 10
- Photon Beam Overview R. Jones - Nov 6 9:00 10:30
- Beam Simulations A. Somov - Nov 6 10:30 12:00
- Photon Beam Line T. Whitlatch - Nov 7 10:30-12:00
- Magnet Design J. Stewart - Nov 7 2:15 - 4:00
- Tagger Optics D. Sober - Nov6 3:30 - 5:00
- Fixed Array Hodoscope F. Klein - Nov 10
- Microscope I. Senderovich Nov 6 - 3:30pm- 4:30pm
- Pair Spectrometer J. Stewart - Nov 6 2:15 3:30
- Diamond Selection and Testing R. Jones - Nov 7 9:00 - 10:30
Richard not available 12:00 - 14:00
Second round of dry runs (week of November 10)
- Thursday Nov 13 and Friday Nov 14
- Overview of Hall D Detector E. C. Aschenauer Friday Nov 14 8am -9am
- 12 GeV Electron Beam Y. Roblin
- Photon Beam Overview R. Jones
- Beam Simulations A. Somov
- Photon Beam Line T. Whitlatch
- Magnet Design J. Stewart
- Tagger Optics D. Sober
- Fixed Array Hodoscope F. Klein
- Microscope I. Senderovich
- Pair Spectrometer J. Stewart
- Diamond Selection and Testing R. Jones
Main Review
- Review: November 19 and 20.
- issues that need special attention