Thursday, Dec 12 at 08:45
- Last 24h:
- DIRC Gem data beam center data collected 1M trigger
- Diamond 0/90 aligned at 8.6GeV.
- 5 hours of good running overnight (0.8B trigger collected)
- Issue:
- DAQ crash
- DAQ issues (of manifest variety)
- DIRC reference signal found in the stand alone configuration
- Alarms for FDC HV
- TAGM translation table
- Data corruption issue in the beginning of the run.
- rcdb event number issue.
- DAQ crash
- Task for today
- Setting up high current test (Sasha)
- CPP test crash (Dave)
- Plan for later
- No sping dance today. Spin dance maybe on Friday whiteboard
- Monitoring
Friday, Dec 13 at 08:45
- Last 24h:
- DIRC Gem data beam center configuration collected additional 5M trigger (6m triggers in total).
- The CPP test (1 hour) run was completed
- Overnight collected ~3 hours of DIRC commissioning data.
- Diamond 0/90 Para/Perp & AMO at 150nA current, coherent peak at 8.6 GeV
- 30 mins Raw mode data taken:
- hd_root crash: https://logbooks.jlab.org/entry/3752755
- Issues:
- DAQ crash
- DIRC reference signal found in the stand alone configuration
- TAGM translation table
- Data corruption issue in the beginning of the run.
- rcdb event number issue.
- Monitoring anomaly observed by Alex:
- ST Timing: https://logbooks.jlab.org/entry/3752783
- normalization to amorphous run for beam monitoring in rootspy updated: https://logbooks.jlab.org/entry/3752755
- Task for today
- Hall Work
- Relocate GEM/TRD
- Installing additional flash module (Sasha)
- Setting up high current test? (Sasha)
- TOF: Beni
- Profiler & FCal prototype: Ashark & Vlad
- Low current ~3nA run (1 hour)? (Sasha)
- Hall Work
- Plan for later
- Spin dance no longer scheduled
- Potential Hall C path change on Tuesday (Change GEM/TRD position again)
- whiteboard
- Monitoring
Monday, Dec 16 at 08:45
- Weekend running:
- DIRC Gem data beam left configuration collected additional 6M trigger.
- Xenon gas test is included
- https://logbooks.jlab.org/entry/3754114
- https://logbooks.jlab.org/entry/3754118
- High rate trigger test completed
- Bottle neck: DIRC at 250-300 nA.
- Sasha is preparing a special trigger configuration
- DIRC commissioning data:
- Nominal configuration (Moroc threshold=100)~3B triggers
- Moroc threshold=50 ~ 2B trigger (this weekend)
- DIRC Gem data beam left configuration collected additional 6M trigger.
- Issues
- Root_spy crash
- Gluon05 monitor blinking issue
- DIRC reference signal found in the stand alone configuration
- TAGM translation table
- Data corruption issue in the beginning of the run.
- DIRC issues:
- Missing tiles: https://logbooks.jlab.org/entry/3754151
- Anomaly DIRC occupancy: https://logbooks.jlab.org/entry/3753658
- Gluon04 desktop manager
- Task for today
- Hall Work
- Relocate GEM/TRD to beam right position
- Installing additional flash module (Sasha)
- Hall Work
- Plan for later
- More test will be after Wednesday
- Current TAC run and TAGM accidental run.
- whiteboard
- Monitoring
- More test will be after Wednesday