Tagger and Beamline Review
From GlueXWiki
Revision as of 18:46, 8 October 2008 by Jstewart (Talk | contribs) (→Dry Run Schedule for the Review)
Contents
The Hall D/GlueX Tagger and Beamline Review
- Agenda
- November 19-20 Review Website (halld guest)
- Previous Reviews
Material Prepared for the Review
- Pre-brief Material for the reviewers
- GlueX-doc-1063 GlueX Physics and Detector Performance Metrics
- Final Talks
- GlueX-doc-1xxx GTemplate
Relevant Wiki Pages
- Description Photon Beam
- Biweekly Meetings
- Drawings (Tim)
Dry Run Schedule for the Review
First round of dry runs (week of October 27)
- Monday L102/104 October 27
- Overview of Hall D Detector E. C. Aschenauer
- 12 GeV Electron Beam Y. Roblin
- Photon Beam Overview R. Jones
- Beam Simulations A. Somov
- Photon Beam Line T. Whitlatch
- Magnet Design J. Stewart
- Tagger Optics D. Sober
- Fixed Array Hodoscope F. Klein
- Microscope I. Senderovich
- Pair Spectrometer J. Stewart
- Diamond Selection and Testing R. Jones
Second round of dry runs (weeks of November 3 and 10)
- Wednesday F326/327 November 5
- Overview of Hall D Detector E. C. Aschenauer
- 12 GeV Electron Beam Y. Roblin
- Photon Beam Overview R. Jones
- Beam Simulations A. Somov
- Photon Beam Line T. Whitlatch
- Magnet Design J. Stewart
- Tagger Optics D. Sober
- Fixed Array Hodoscope F. Klein
- Microscope I. Senderovich
- Pair Spectrometer J. Stewart
- Diamond Selection and Testing R. Jones
Main Review
- Review: November 19 and 20.
- issues that need special attention