Run Planning Meeting Notes, March 1 - March 8, 2023
From GlueXWiki
Zoom connect Meeting ID: 160 199 0060 / Passcode 8394
Hall D counting room white board
Thursday March 2
Past 24 hours
- MCC "Maintenance Day"
- TAGM work on radiated crates
- Production runs
Shift Reports
Early Riser Day Swing [ Owl]
Reports
- second atmospheric pressure sensor added (Hovanes)
- 5x5 Sciglass Detector Prototype (Sasha)
- rho yields addressing TagM Issue (Alex)
- CDC AI HV control enabled (David L)
Issues
- Coherent peak
- TAGM tripped off (MCC - Daniel)
Plans
- Production (300 nA, 2h runs) with cycle:
- 2 runs PARA (0/90)
- 2 runs PERP (0/90)
- 2 runs PARA (45/135)
- 2 runs PERP (45/135)
- 1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI)
- Will we need a harp scan? MCC took away beam quite a while yesterday (nearly 14 hours before we got beam back)
- Richard wants to do a run with specific settings on TAGM to check gains. This was to be set for primetime Wednesday night if beam came back. 1 hr became 4 hr and shift crew failed to reach him. Maybe table to tomorrow
- Sasha left segments of detector prototype for RadCon survey on Survey Table. He looks to ask the likes of Scot for guidance.