Aug 30, 2011 Calorimetry
From GlueXWiki
Teleconference Time: 11:00 a.m. EST'
- ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)
- JLab Phone: in CC F326 is 757-269-6337; JLab Phone in CC L207 is 757-269-7084
- Athens Phone: in Christina's office is 011-30-210-727-6947
- Regina Phone: in LB228 is 306-585-4204
- Phone connection only upon request.
- +1-866-740-1260 : US+Canada
- +1-303-248-0285 : International
- then enter participant code: 3421244# (remember the "#").
- or www.readytalk.com (and code without the #)
Items for followup from previous meeting(s)
- Beam test
-
Elton to check actual space in Hall B relative to the proposed drawing
-
Tentative Agenda
- Announcements
- Review of Action Items
- Monitoring
- FCAL
- Construction Status: mechanical, bases (notes from Matt)
- We received 10 first article COMM boards from Total Electronics.
- Assembly quality was not superb. The main problem was that the solder was not heated enough (dull and gray instead of shiny). Paul sent them back and we are waiting for a new batch.
- Construction Status: mechanical, bases (notes from Matt)
- BCAL
- Construction Status: builds, fibre QA
- Simulations/Reconstruction
- Beam tests in Hall B (fall 2011) (Kei)
- Any other business
Minutes
Attending: Elton, Jim, Beni, Yi, Eugene (Jlab); Will (USM); Christine, Stratos (Athens); Zisis, Andrei (UofR).
- Announcements
- Review of Action Items
- Monitoring
- FCAL
- Construction Status: mechanical, bases (notes from Matt)
- We received 10 first article COMM boards from Total Electronics.
- Assembly quality was not superb. The main problem was that the solder was not heated enough (dull and gray instead of shiny). Paul sent them back and we are waiting for a new batch.
- Construction Status: mechanical, bases (notes from Matt)
- BCAL
- Construction Status: builds, fibre QA
- Simulations/Reconstruction
- Beam tests in Hall B (fall 2011) (Kei)
- Any other business