July 5, 2011 SiPM Electrical and Cooling
From GlueXWiki
Revision as of 17:14, 21 June 2012 by Elton (Talk | contribs) (Created page with "== Action Items from previous meetings == # Develop front and back views of jumper sheets. Also get latest version of drawings (Jack) # Check into AC units based on Peltier cool...")
Action Items from previous meetings
- Develop front and back views of jumper sheets. Also get latest version of drawings (Jack)
- Check into AC units based on Peltier coolers for SiPM production tests (Fernando)
- Design tooling/procedure for making the patterns for wrapping from tedlar (Jim)
- Review Fcal LED and controller monitoring boards (Fernando)
Tentative Agenda
- Announcements
- Action Items
- Schedule, reporting, and manpower (Elton)
- Beam test experience (Elton)
- SiPM production testing (everyone)
- Mechanical assembly (Scot)
- Mechanical (Jim)
- Mechanical drawings (Chuck)
- Temperature compensation (Jack)
- Preamp-summing (Chris)
- Light guide gluing setup
Minutes
Attending: