GlueX Start Counter Meeting, January 10, 2013
GlueX Start Counter Meeting
Thursday, January 10, 2013
10 am EST
JLab: CEBAF Center F326/327
Agenda
- Announcements
- Review minutes from previous meeting
- Counter Construction
- SiPM read-out status
- Light collection study status
- Contract
Communication Information
Video Conferencing
- ESNet: 8542553
- EVO:
- Direct meeting link
- Phone Bridge ID: 13 2615
Slides
Talks can be deposited in the directory /group/halld/www/halldweb1/html/talks/2013-1Q
on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2013-1Q/ .
Minutes
start counter meeting notes
chuck, beni, mark, sascha, eugene puneet, werner, eric
discussion on drawings
email to chuck hurlburt, talked to guy who would run this project, proposal will be done
mcneal, if bent scintillator, is that OK get a counter through working also on design of assembly jig
got st-2 board returned from fernando not tested yet gain measurement new student next week, will work on testing
start with phototube, measure gain measure a source get a number of p. e. measure with sipm number of photoelectrons, work on typical signal size need timing and amplitude information , need to do walk correction looking at low signal end change
ask Jarrod about deadline
600 sipms have been received three counter electronics
<end of note>