Minutes-5-2-2013
From GlueXWiki
Revision as of 18:37, 1 May 2013 by Pentchev (Talk | contribs) (Created page with "MAy 2, 2013 FDC meeting = Agenda = # Production [http://www.jlab.org/Hall-D/detector/fdc/production/FDC_Construction_May_2_2013.xlsx Construction Tracking] #* Third package stat...")
MAy 2, 2013 FDC meeting
Agenda
- Production Construction Tracking
- Third package status
- Spare package
- Installation (Lubomir, Bill)
- FDC installation document
- Practicing at Blue Crab
- Engineering (Bill)
- Cooling system status
- Electronics (Chris, Nick)
- Full electronics tests FDC E-log (Beni)
- Other