CPP and NPP Readiness Review
From GlueXWiki
Revision as of 09:15, 14 January 2021 by Elton (Talk | contribs) (→Draft Outline Presentations (Tentative Feb 10))
Preparations for the CPP and NPP Readiness Review
- Goal: Complete Readiness Review in time to schedule experiment in 2022
- Media:Coarse Acc Schedule 2021.pdf
Contents
Planning for Experiment
Draft Outline Presentations (Tentative Feb 10)
- Reviewers
- Agenda ***DRAFT***
- 08:30-09:00 Executive session
- 09:00-09:45 (30+15) Overview of experiment and setup -- Rory Miskimen ?
- 09:45-10:30 (30+15) Engineering design and installation of the platform and muon chambers -- Tim Whitlatch ?
- 10:30-11:00 Coffee break
- 11:00-11:30 (20+10) Project implementation, resources and schedule -- Elton Smith ?
- 11:30-12:00 Executive Session
- 12:00 Questions from Reviewers
- 12:00-14:30 Lunch and Executive Session
- 14:30 Closeout
- ERR Final Report
- Addressing ERR Review Recommendations
Additions to Standard Equipment
The major modifications required to operate the experiment are the following
- Design, fabrication and installation of the muon detector
- Multi-wire proportional chambers
- Modifications to the downstream platform, support structure and iron absorbers
- New (mono-isotopic) solid Pb target
- Charged-particle trigger based on the time-of-flight detectors
- Move tagger microscope to cover 6 GeV coherent peak
Platform Design
Trigger Discussion
Discussion topics with Sasha and Hai
- CPP / NPP plan is to run multiple TOF configuration files + FCAL trigger with possibly a lower threshold.
- Confirm that no new firmware is needed for the TOF, i.e. modifications for TOF only need different configuration files
- We would like to run the TOF trigger with multiple configuration files plus the FCAL trigger
References:
Documentation for Review
- CPP Jeopardy Presentation PAC 48 September 24, 2020
- CPP Jeopardy Update PAC 48 June 22, 2020
- CPP wiki page
- NPP wiki page
- OSP for muon chambers
- Receipt and checks at JLab
- Electronics from CDC
- Gas system from CDC
- Signal cables
- Drawings for support structure and iron absorbers
- Procedures for installation of muon detector
- Description of TOF trigger