Analysis shift
From GlueXWiki
Contents
[hide]Analysis Shift
Note:
CC Room 306 is ours to use throughout the experiment for collaboration and work.
Daily Analysis meeting at 2pm EST (CC room 326): https://bluejeans.com/773909590/1171
Sign Up for Analysis Shifts
Shifts are 12 hours. They encouraged to be taken on site, but they may be taken remotely with connection to the Counting House (join here).
Responsible for:
- Ensuring work shift run spreadsheet is maintained during the 12 hour shift,
- Where to find information to fill the spreadsheet
- Completing data quality run-by-run,
- Checking data coming in from monitoring (plot browser),
- Contacting the appropriate team member if there is a concern with a specific monitoring plot,
- Contact the counting house ( (757)269-5504) )
- Update daily analysis meeting with production runs,
- Update list of production runs at the bottom of this page.
Physics Shift
(Will be merged with Analysis Shift) Responsible for Running Physics Plugins
- (γ,ρ-p) Channel Analysis
- On the ifarm:
- cd /work/halld2/home/src-ct/HallD_SRC-CT_Analysis/analysis_scripts/proton_rhoMinus/
- ./offline_monitoring "Run Number"
- cd /work/halld2/home/src-ct/offline_monitoring/RunPeriod-2021-08/ver01/proton_rhoMinus/
- cat counts_081474.txt
- Input that into this spreadsheet
- On the ifarm:
- (γ,ρ0p) Channel Analysis
List of good production runs
- updated until: 90064
- By radiator:
- amorphous radiator: 90034-90039, 90045, 90062
- diamond radiator: 90051, 90059, 90061, 90063-90064
List of trigger configurations
- FCAL_BCAL_PS_SRC_m9.conf/FCAL_BCAL_PS_SRC_m10.conf (raw mode)
- Bit 1: FCAL (250 MeV) + BCAL (200 MeV) & ST
- Bit 2: FCAL (4 GeV ) + BCAL (1.3 GeV)
- Bit 3: PS