Analysis shift
From GlueXWiki
Contents
Experimental Details
Run Wiki
Run Plan
Useful Links
SRC@GlueX page
Shift Schedule
Note:
People onsite are welcome to use CC Room 306 throughout the experiment for collaboration and work.
Daily Analysis meeting at 2pm EST (CC room 326): https://bluejeans.com/773909590/1171
HallD Counting House (join here)
Sign Up for Analysis Shifts
Responsible for:
- Ensuring work shift run spreadsheet is maintained during the 12 hour shift,
- Where to find information to fill the spreadsheet
- Completing data quality run-by-run,
- Checking data coming in from monitoring (plot browser),
- Contacting the appropriate team member if there is a concern with a specific monitoring plot,
- Contact the counting house ( (757)269-5504) )
- Update daily analysis meeting with production runs,
- Update list of production runs at the bottom of this page.
Calibration
Physics Shift
(Will be merged with Analysis Shift) Responsible for Running Physics Plugins
- (γ,ρ-p) Channel Analysis
- On the ifarm:
- cd /work/halld2/home/src-ct/HallD_SRC-CT_Analysis/analysis_scripts/proton_rhoMinus/
- ./offline_monitoring "Run Number"
- cd /work/halld2/home/src-ct/offline_monitoring/RunPeriod-2021-08/ver01/proton_rhoMinus/
- cat counts_081474.txt
- On the ifarm:
- (γ,ρ0p) Channel Analysis
- Current Data Spreadsheet
List of good production runs
- updated until: 90120
- runs_src.dat
- He-4: 90034-90039, 90045, 90051, 90059, 90061-90064, 90070-90082, 90084-90088, 90090-90095, 90098-90108, 90114-90120
NOTES TO SOLVE (to be edited as they are solved):
- Igal informed (11/11/2021 05:44) that run 90039 is not in the database accesible by the Python script. But it is in the RCDB. (CA)
List of trigger configurations
- FCAL_BCAL_PS_SRC_m9.conf/FCAL_BCAL_PS_SRC_m10.conf (raw mode)
- Bit 1: FCAL (250 MeV) + BCAL (200 MeV) & ST
- Bit 2: FCAL (4 GeV ) + BCAL (1.3 GeV)
- Bit 3: PS