JEF meeting, February 18, 2022
From GlueXWiki
Meeting time and location
- 9:30 am EST (JLab time) remote only
- Zoom meeting ID: 161 050 9142 Passcode: 004965
Agenda
- Preparation for mass production of FCAL2 modules -- Sasha
- got 6 more fixtures from NPS to preshape ESR. 16 fixtures can be loaded to the oven now. Expected DSG production rate: up to 72 foils per week
- Regular meeting with the DSG group during next week. Try to coordinate crystal wrapping.
- Arshak and Sasha are working on preparing supplies.
- Silicon cookies
- Light guides
- Matching PMT housing and mu-metal cylinders (sorting out cylinder by the diameter). Had a meeting with Tim regarding 'machining' the hole in the PMT housing.
- Igal is cutting Kapton, ESR (for LG), and mu-metal
- Chris A. continues brazing brass strips; we are running short with them (Chris is involved in the CPP installation). Trying to get him more involved (discussing with Tim and Mark)
- got 6 more fixtures from NPS to preshape ESR. 16 fixtures can be loaded to the oven now. Expected DSG production rate: up to 72 foils per week
- Module fabrication -- Sasha
- Light Monitoring System
- COMCAL tests, TAC running, etc.
- Data analysis
- Simulations