Thursday, September 1
Past 24 hours
- Be target inserted
- 5 FCAL bases replaced (Rebecca)
- Electric work
- AC & SC Electronics (Nick)
- Target alarms temporarily disabled
- [1], [2], [3] Active Collimator studies
- AC calibration, new lock positions
- More details can be found here
- Overnight production running at 200 nA
Issues
- FDC and CDC alarms
- 3 channels of start counter lost on Firday around 14:00h during snake scan. Since no monitoring plots were published till run 110449 Monday 22:30 this issue was not immediately seen. This was fixed yesterday during the target change. logbook 403559
- According to the TOF paddle rates the TOF detector as a whole is a little to the right and low on the beam. (higher rates on the vertical paddles_beam_left and higher rates on the horizontal paddles_beam_up). logbook 403559
- Thanks to Thomas HYDRA is now working also.
- RCDB not uptading from around 08.30, possibly related to DAQ issue at start of last run
- No charger for the RC phone, currently at 71%
Plan
- Brief accelerator downtime around 1pm for preventative maintenance on a UPS in the injector
- Trigger study (Sasha)
- Detector checkout (raw mode for ADCs & pi0 for FCAL)
- Intensity scan?
- Physics production
- Take data with B-field (six shifts at 200 nA, then two each at 100 nA and 50 nA)
The hot checkout page
Readiness Check List
- Solenoid (Eugene/Beni)
- Start the run with magnetic field on
- Surveys (Tim/Mark)
- FCAL survey
- TOF survey
- ST survey
- TAGM
- TAGH
- Survey beamline component (secondary collimator, PS, beam pipe downstream the PS, etc.)
- Survey CCAL after it's installed in the Hall
- DAQ (Sergei).
- Include CDC1, ST, and CCAL crates to the readout. Power the detector, continue taking cosmic data during the detector configuration change.
- Trigger (Alex S.)
- Check physics triggers
- Run CCAL trigger when the detector is installed in the Hall
- Connect / check CCAL LED and alpha triggers
- Beam line
- Install He beam pipe between FCAL and CCAL (Tim)
- Install led shielding wall in front downstream the PS (Tim)
- Radiator status
- Check amorphous radiator
- Tagger hodoscope (A. Somov)
- Install plates with TAGH counters
- Install / check repaired TAGH countes
- Tagger microscope (Tim / Richard Jones)
- Move TAGM to the new location and rotate
- Collimator Motion (Hovanes)
- Not changed
- Active collimator detectors(Richard Jones/Alexandre Deur)
- Move active collimator to 5 mm hole
- Check
- Profiler (Hovanes)
- Not changed
- Luminosity monitor (Hovanes)
- Not changed
- Halo monitors
- Not changed
- PS system (Alex Somov)
- Not changed
- Beam line magnets (PS magnet sweeping magnet and tagger quads).
- Change filed of the PS magnet
- Polarimeter (Sebastian Cole/M. Dugger)
- Optional, not used in PrimEx
- Targets (Chris/Tim/Alexandre D.)
- LH4
- Be
- TAC (Alex Somov/Hovanes)
- Use CCAL (TAC can be used as a backup)
- Slow control (Hovanes)
- Check CCAL
- RF (Sergei)
- Not changed
- Radiation monitors (Alexandre D.)
- Not changed
- Detector systems
- ST (Beni)
- Connect cables, check dark rate
- FDC (Lubomir)
- Not changed
- CDC (Beni)
- Move CDC1 crate to the nominal position, cable up
- Check readout
- BCal (Mark D. / Elton)
- Not changed
- FCal (Mark D.)
- Check / replace bases if needed
- ComCal (Alex Somov)
- Check detector controls (Nick)
- Install CCAL platform
- Check platform motion
- Installed detector on the platform
- Connect cables
- Connect LMS
- Check detector
- TOF (Beni)
- Remove inner acrylic absorber
- ST (Beni)