May 26, 2011 Calibration/Monitoring
From GlueXWiki
Teleconference Time: 08:00 CST (Regina) / 10:00 EDT / 16:00 GMT+2 (Athens)
- Connection: ESNET
Background information
- Monitoring R&D issues for the relative gain calibration and monitoring system for the calorimeters and possibly other detector systems.
- Calibration Specifications Table for BCAL, FCAL, TOF and START
- Calibration and Monitoring System Meetings Previous minutes
Action Items
- Can George calculate the % deviation from linearity on his plot?
-
USM should be contacted to send more LGs to Athens: Athens has requested 15 units, 12 for one side and 3 for the opposing side of the baby cal. Regina is working on its request. -
Christina will probe Kappos for cabling and other board issues. - BCAL Fibre location and angle, as well as mounting sequence should be flushed out. (Zisis)
Tentative Agenda
- MoU Progress
- Monitoring system concepts
Minutes
Attendees: Christina (Athens), Elton (JLab), Zisis (Regina)