Sep 27, 2011 Calorimetry
From GlueXWiki
Teleconference Time: 11:00 a.m. EST'
- ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)
- JLab Phone: in CC F326 is 757-269-6337; JLab Phone in CC L207 is 757-269-7084
- Athens Phone: in Christina's office is 011-30-210-727-6947
- Regina Phone: in LB228 is 306-585-4204
- Phone connection only upon request.
- +1-866-740-1260 : US+Canada
- +1-303-248-0285 : International
- then enter participant code: 3421244# (remember the "#").
- or www.readytalk.com (and code without the #)
Items for followup from previous meeting(s)
- Monitoring
- Beam test
-
Zisis will start a list of goals and requirements for the Bcal test.Page: http://www.jlab.org/Hall-D/software/wiki/index.php/BCAL_Beam_Tests_2012
-
Tentative Agenda
- Announcements
- Review of Action Items
- Monitoring. Christina cannot participate, but she sent this note;
- I can report that the new LED's have arrived, Kappos will mount them this week and hopefully we will test them next week.
- I will also send you few slides over the weekend to prsent in the coll.meeting.
- FCAL
- Construction Status: mechanical, bases (notes from Matt)
- BCAL
- Construction Status: builds
- Simulations/Reconstruction
- Timing measurements of SiPMs GlueX-doc-1814 (Elton)
- Beam tests in Hall B (fall 2011) (Kei)
- Contact with Hall B (Elton)
- After talking to Stepan, he got an estimate from Doug to remove the blower and pipes (1/2 day). It is a good filler job and he will pass this on to Dave so that it gets added to the Hall B task list.
- Contact with Hall B (Elton)
- Discussions of presentations at GlueX-Collaboration-Sep-2011
- Any other business
Minutes
Attending: Yi, Beni, Tim, Elton, Dave (Jlab); Zisis, Andrei (UofR); Matt, Kei (IU)
- Announcements
- Review of Action Items
- Monitoring. Christina cannot participate, but she sent this note;
- I can report that the new LED's have arrived, Kappos will mount them this week and hopefully we will test them next week.
- I will also send you few slides over the weekend to prsent in the coll.meeting.
- FCAL
- Construction Status: mechanical, bases (notes from Matt)
- BCAL
- Construction Status: builds
- Simulations/Reconstruction
- Timing measurements of SiPMs GlueX-doc-1814 (Elton)
- Beam tests in Hall B (fall 2011) (Kei)
- Contact with Hall B (Elton)
- After talking to Stepan, he got an estimate from Doug to remove the blower and pipes (1/2 day). It is a good filler job and he will pass this on to Dave so that it gets added to the Hall B task list.
- Contact with Hall B (Elton)
- Discussions of presentations at GlueX-Collaboration-Sep-2011
- Any other business