July 5, 2011 SiPM Electrical and Cooling
From GlueXWiki
Action Items from previous meetings
- Develop front and back views of jumper sheets. (Jack)
- Check into AC units based on Peltier coolers for SiPM production tests (Fernando)
- Review Fcal LED and controller monitoring boards (Fernando)
- Decide on size of overlap of voltage bins for the SiPMs (Yi and Jack)
Tentative Agenda
- Announcements
- Action Items
- Schedule, reporting, and manpower (Elton)
- SiPM production testing (everyone)
- SiPMs assignment for new boards
- Mechanical assembly (Scot)
- Mechanical (Jim)
- Mechanical drawings (Chuck)
- Temperature compensation (Jack)
- Preamp-summing (Chris)
- Light guide gluing setup
Minutes
Attending:Jack, Nick, Chris, Elton, Jim
- Announcements
- Action Items
- Schedule, reporting, and manpower (Elton)
- SiPM production testing (everyone)
- SiPMs assignment for new boards
- Mechanical assembly (Scot)
- Mechanical (Jim)
- Mechanical drawings (Chuck)
- Temperature compensation (Jack)
- Preamp-summing (Chris)
- Light guide gluing setup