Primer for shift takers DRAFT

From GlueXWiki
Revision as of 15:47, 3 May 2015 by Jvega (Talk | contribs) (Items of the Hall D Shift Check-list)

Jump to: navigation, search

=Primer for Shift Takers

Introduction

This document is an aid to fill the Hal D Shift Check-list.


How to use this guide

Items of the Hall D Shift Check-list


Item [Main Action Bar on EPICS] Subsystem-Component Number Figure More info
Beam Energy (GeV)  ?  ?  ?  ?
e- Beam Current (uA)  ?  ?  ?  ?
Radiator (RL)  ?  ?  ?  ?
Tagger current (A)/field(T)  ?  ?  ?  ?
Solenoid current (A)  ?  ?  ?  ?
Solenoid temperature ok? Record He Return pressure  ?  ?  ?  ?
Target type  ?  ?  ?  ?
Collimator aperture (mm)  ?  ?  ?  ?
All High Voltage ok? check box for BCal, FCal, CDC, FDC, TOF, ST, PS, TagM, TagH)  ?  ?  ?  ?
 ?  ?  ?  ?
 ?  ?  ?  ?
 ?  ?  ?  ?
 ?  ?  ?  ?
 ?  ?  ?  ?
 ?  ?  ?  ?



Item [Main Action Bar on EPICS] Subsystem-Component Number Figure More info


  • Trigger rate (kHz)
  • Trigger file/DAQ config.
  • Pair Spec. current (A)
  • Pair Spec. converter (RL)
  • Visual Halls Inspection
  • DAQ screens up
  • Epic summary screen up?
  • Alarm handlers up
  • Hall D electronic logbook up
  • MCC Epics monitoring screen up
  • Beam position on profilers OK? (upstrm/dwstrm)
  • BPM AD00 (tagger dump)
  • Quadrupole MQPAD00 on?
  • Event display ok?
  • Online monitoring screens up
  • Online monitoring histo ok? check box for BCal, FCal, CDC, FDC, TOF, ST, PS, TagM, TagH)
  • Ar Gas supply Bank left(psi)
  • Ar Gas supply Bank right(psi)
  • CO2 Gas supply Bank left(psi)
  • CO2 Gas supply Bank right(psi)
  • Alcohol Bubbler top (bubbles/level?)
  • Alcohol Bubbler bottom (bubbles/level?)
  • Screen-shot of Epics Overview screen posted on HDlog?
  • Check list printed and added to check-list binder?
  • Target Temp/Press (High/low cell T/In/out/vacuum P)

Accelerator Screen - Hall D Status

EPICS Overview Screen