Primer for shift takers DRAFT
From GlueXWiki
Revision as of 15:39, 4 May 2015 by Jvega (Talk | contribs) (→Items of the Hall D Shift Check-list)
Contents
=Primer for Shift Takers
This document is an aid to fill the Hall D Shift Check-list required in every shift at the Hall D Counting House. The required entries can be found by different ways, here is presented one of those, and it is provided an easy access to the information.
How to use this guide
Some text
Items of the Hall D Shift Check-list
Item | Main Action Bar on EPICS Subsystem - Component | Number | Example Figure | More info |
Beam Energy (GeV) | BEAM - JTABs | 1 | Accelerator Screens | |
e- Beam Current (uA) | BEAM - JTABs | 2 | Accelerator Screens | |
Radiator (RL) | GENERAL - EPICS Overview | 3 | ? | |
Tagger current (A)/field(T) | GENERAL - EPICS Overview | ? | ? | ? |
Solenoid current (A) | GENERAL - EPICS Overview | ? | ? | ? |
Solenoid temperature ok? Record He Return pressure | GENERAL - EPICS Overview | ? | ? | ? |
Target type | GENERAL - EPICS Overview | ? | ? | ? |
Collimator aperture (mm) | ? | ? | ? | ? |
All High Voltage ok? check box for BCal, FCal, CDC, FDC, TOF, ST, PS, TagM, TagH) | ? | ? | ? | ? |
Trigger rate (kHz) | ? | ? | ? | ? |
Trigger file/DAQ config. | ? | ? | ? | ? |
Pair Spec. current (A) | ? | ? | ? | ? |
Pair Spec. converter (RL) | GENERAL - EPICS Overview | ? | PS Convert | |
Visual Halls Inspection | ? | ? | ? | ? |
DAQ screens up | ? | ? | ? | ? |
Epic summary screen up? | ? | ? | ? | ? |
Alarm handlers up | ? | ? | ? | ? |
Hall D electronic logbook up | ? | ? | ? | ? |
MCC Epics monitoring screen up | ? | ? | ? | ? |
Beam position on profilers OK? (upstrm/dwstrm) | ? | ? | ? | ? |
BPM AD00 (tagger dump) | ? | ? | ? | ? |
Quadrupole MQPAD00 on? | ? | ? | ? | ? |
Event display ok? | ? | ? | ? | ? |
Online monitoring screens up | ? | ? | ? | ? |
Online monitoring histo ok? check box for BCal, FCal, CDC, FDC, TOF, ST, PS, TagM, TagH) | ? | ? | ? | ? |
Ar Gas supply Bank left(psi) | ? | ? | ? | ? |
Ar Gas supply Bank right(psi) | ? | ? | ? | ? |
CO2 Gas supply Bank left(psi) | ? | ? | ? | ? |
CO2 Gas supply Bank right(psi) | ? | ? | ? | ? |
Alcohol Bubbler top (bubbles/level?) | ? | ? | ? | ? |
Alcohol Bubbler bottom (bubbles/level?) | ? | ? | ? | ? |
Alcohol Bubbler bottom (bubbles/level?) | ? | ? | ? | ? |
Screen-shot of Epics Overview screen posted on HDlog? | ? | ? | ? | ? |
Check list printed and added to check-list binder? | ? | ? | ? | ? |
Target Temp/Press (High/low cell T/In/out/vacuum P) | ? | ? | ? | ? |
Hall D Status - MCC Accelerator Screen
.................test.....................................test....................