Difference between revisions of "2012-08-08"

From GlueXWiki
Jump to: navigation, search
(MOU and Contract Status)
(Reports from Technical Groups)
 
Line 42: Line 42:
 
* Calorimeters
 
* Calorimeters
 
** Beam Tests
 
** Beam Tests
** Calorimetry [[Jul 17, 2012 Calorimetry|July 17, 2012]]
+
** Calorimetry [[Jul 31, 2012 Calorimetry|July 31, 2012]]
** BCAL Readout [[Jul 24, 2012 Readout|July 24, 2012]]
+
** BCAL Readout [[Aug 7, 2012 Readout|August 7, 2012]]
 
** Technical Design Report
 
** Technical Design Report
* Tracking [[July 18, 2012 Tracking CDC/FDC | July 18, 2012]]
+
* Tracking [[August 1, 2012 Tracking CDC/FDC | August 1, 2012]]
 
** CDC
 
** CDC
 
** FDC
 
** FDC
 
** Technical Design Report
 
** Technical Design Report
 
* PID  
 
* PID  
** TOF [[GlueX TOF Meeting, July 19, 2012#Minutes|July 19, 2012]]   
+
** TOF [[GlueX TOF Meeting, August 2, 2012#Minutes|August 2, 2012]]   
** Start Counter [[GlueX Start Counter Meeting, July 12, 2012#Minutes|July 12, 2012]]
+
** Start Counter [[GlueX Start Counter Meeting, July 26, 2012#Minutes|July 26, 2012]]
 
** PID Upgrades [[July 23, 2012 PID Upgrade|July 23, 2012]]
 
** PID Upgrades [[July 23, 2012 PID Upgrade|July 23, 2012]]
 
** Technical Design Report
 
** Technical Design Report
Line 61: Line 61:
 
* Electronics
 
* Electronics
 
** Technical Design Report
 
** Technical Design Report
* Trigger [[OWG Meeting 18-Jul-2012 |July 18, 2012]]
+
* Trigger [[OWG Meeting 1-Aug-2012 |August 1, 2012]]
 
** Technical Design Report
 
** Technical Design Report
* DAQ/Monitoring/Controls [[OWG Meeting 18-Jul-2012 |July 18, 2012]]
+
* DAQ/Monitoring/Controls [[OWG Meeting 1-Aug-2012 |August 1, 2012]]
 
** Technical Design Report
 
** Technical Design Report
 
* Offline  
 
* Offline  
** Software Meeting [[GlueX Offline Meeting, July 11, 2012#Minutes|July 11, 2012]]
+
** Software Meeting [[GlueX Offline Meeting, July 25, 2012#Minutes|July 25, 2012]]
** Data Challenge [[GlueX Data Challenge Meeting, July 16, 2012|July 16, 2012]]
+
** Data Challenge [[GlueX Data Challenge Meeting, July 30, 2012|July 30, 2012]]
 
** Technical Design Report
 
** Technical Design Report
 
* Photon Beam and Tagger [[BLTWG Meeting 07/23/2012|July 23, 2012]]
 
* Photon Beam and Tagger [[BLTWG Meeting 07/23/2012|July 23, 2012]]
 
** Technical Design Report
 
** Technical Design Report
* Physics [[July 16, 2012 (11:30AM), Physics Working Group|July 16, 2012]]
+
* Physics [[July 30, 2012 (11:30AM), Physics Working Group|July 30, 2012]]
  
 
=== AOT ===
 
=== AOT ===

Latest revision as of 09:53, 8 August 2012

Meeting Time and Place

The meeting will be on Wednesday August 8, 2012 at 11:00am EDT. For those people at Jefferson Lab, the meeting will be in room F326.

Meeting Connections

To connect from the outside:

1.) ESNET:

   Call ESNET Number 8542553 (this is the preferred connection method).

2.) Phone: (should not be needed)

  +1-866-740-1260 : US and Canada
  +1-303-248-0285 : International
    then use participant code: 3421244# (the # is needed when using the phone)
  or www.readytalk.com
   then type access code 3421244 into "join a meeting" (you need java plugin)

3.) EVO:

   A conference has been booked under "GlueX" from 10:00am until 1:00pm (EST).
  • To phone into an EVO meeting, from the U.S. call (626) 395-2112 and then enter the EVO meeting code, 103736. Instructions for the Phone Bridge to EVO.
  • Skype Bridge to EVO

Agenda

Announcements

MOU and Contract Status

Technical Design Report

Reports from Technical Groups

AOT