Difference between revisions of "2012 Software Review Planning Meeting: Apr. 6, 2012"
From GlueXWiki
(updated links to newer version of tight spots/management plan slides) |
(→Agenda) |
||
Line 28: | Line 28: | ||
** Introductory talk ([http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1949 preliminary sildes]) with notes. | ** Introductory talk ([http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1949 preliminary sildes]) with notes. | ||
** [https://halldweb1.jlab.org/talks/2012-1Q/manpower_survey.pdf Software Manpower within collaboration] (no change) (Mark) | ** [https://halldweb1.jlab.org/talks/2012-1Q/manpower_survey.pdf Software Manpower within collaboration] (no change) (Mark) | ||
− | ** [[2012 Offline Computing Schedule]] | + | ** [[2012 Offline Computing Schedule]] (David) |
+ | ***[https://halldsvn.jlab.org/repos/trunk/docs/offline/ProjectProgress/OfflineComputingActivities2012.pdf OfflineComputingActivities2012.pdf ] | ||
** Software Milestones/Challenges | ** Software Milestones/Challenges | ||
** Calibration/Alignment | ** Calibration/Alignment | ||
** Computing Resources in the Collaboration | ** Computing Resources in the Collaboration | ||
− | |||
=Minutes= | =Minutes= |
Revision as of 09:31, 6 April 2012
Main Hall-D Software Review Page
Contents
Connecting
Phone:
- +1-866-740-1260 : US+Canada
- +1-303-248-0285 : International
- then enter participant code: 3421244# (remember the "#").
- or www.readytalk.com (and code without the #)
Agenda
- Previous Meeting (Mar. 23, 2012)
- Status of Review Organization (JLab organizers)
- Time-line for Hall-D
- March 30-April 4
- April 23-27 - talk outlines.
- April 30 - Written material for the review (CDR?).
- May 14/15 - First draft of presentations for dry run.
- May 24/25 or 29/30 - Final talks with timed presentations.
- June7/8 Software Review at JLab.
- Cross-Hall Collaboration
- Organization of Hall-D preparations for Review
- Introductory talk (preliminary sildes) with notes.
- Software Manpower within collaboration (no change) (Mark)
- 2012 Offline Computing Schedule (David)
- Software Milestones/Challenges
- Calibration/Alignment
- Computing Resources in the Collaboration
Minutes
TBD