Difference between revisions of "2014-10-15"
From GlueXWiki
(→Reports from Technical Groups) |
(→Reports from Technical Groups) |
||
Line 44: | Line 44: | ||
** FCAL | ** FCAL | ||
** BCAL - [https://logbooks.jlab.org/book/hdbcal BCAL Logbook] | ** BCAL - [https://logbooks.jlab.org/book/hdbcal BCAL Logbook] | ||
− | ** BCAL Reconstruction [[ | + | ** BCAL Reconstruction BCAL [[Reconstruction Meeting 2014-09-18 | September 18, 2014]] |
* Tracking [[Minutes-10-9-2014|Joint FDC/CDC Meeting October 9, 2014]] | * Tracking [[Minutes-10-9-2014|Joint FDC/CDC Meeting October 9, 2014]] | ||
** CDC | ** CDC |
Revision as of 10:21, 15 October 2014
_TOC__
Contents
Meeting Time and Place
The meeting will be on Wednesday October 15, 2014 at 11:15am EDT. For those people at Jefferson Lab, the meeting will be in room F326.
Meeting Connections
- To join via a Web Browser, go to the page [1] https://bluejeans.com/660743227.
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 660743227.
- To join via phone, use one of the following numbers and the Conference ID: 660743227.
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- Upon connection all microphones are automatically muted. To unmute your mike on a Polycom or equivalent unit, enter *4. Unmuting on a computer is trivial as there is a microphone button than can be clicked.
- More information on connecting to bluejeans is available.
Agenda
Announcements
- Accelerator Schedule Update
Running in Fall 2014
- Coordination
- Run Coordinator - Alexandre Deur
- Physics Division Liaison - Yi Qiang
- Shift Scheduler - Reinhard Schumacher
- Analysis Coordinator - Volker Crede or designate from Physics group
- Plans
- Manpower
- Shift Schedule site available
- Schedule October now
Ongoing Activities
- Technical Construction Report
Reports from Technical Groups
- Calorimeters: October 9, 2014
- FCAL
- BCAL - BCAL Logbook
- BCAL Reconstruction BCAL September 18, 2014
- Tracking Joint FDC/CDC Meeting October 9, 2014
- CDC
- FDC
- FADC FPGA October 14, 2014
- PID
- TOF October 7, 2014
- Start Counter August 21, 2014
- PID Upgrades August 29, 2014
- DAQ/Monitoring/Controls October 8, 2014
- Engineering
- Magnets
- Target
- Engineering Activities
- Installation
- Electronics
- Trigger
- Hardware (Level-1) October 8, 2014
- Software (Level-3) September 2, 2014
- Offline Software
- Offline September 3, 2014
- Calibration October 8, 2014
- Photon Beam and Tagger October 13, 2014
- Physics October 6, 2014