Difference between revisions of "2020-07-02"
From GlueXWiki
(→Additional brief reports from working groups as needed) |
(→Additional brief reports from working groups as needed) |
||
Line 42: | Line 42: | ||
* Software and Analysis | * Software and Analysis | ||
** Production and Analysis Working Group: [https://halldweb.jlab.org/wiki-private/index.php/July_1,_2020,_Analysis_Working_Group July 11, 2020] (Alex) | ** Production and Analysis Working Group: [https://halldweb.jlab.org/wiki-private/index.php/July_1,_2020,_Analysis_Working_Group July 11, 2020] (Alex) | ||
− | ** Offline Meeting: [[GlueX_Software_Meeting, | + | ** Offline Meeting (cancelled) last meeting: [[GlueX_Software_Meeting,_June_9,_2020| June 9, 2020]] (Mark) |
** Particle ID Working Group: [[GlueX_PID_Meeting,_June_30,_2020 | June 30, 2020]] (Simon) | ** Particle ID Working Group: [[GlueX_PID_Meeting,_June_30,_2020 | June 30, 2020]] (Simon) | ||
Line 59: | Line 59: | ||
*** [https://halldweb.jlab.org/wiki/index.php/June_18,_2020_CPP_Design_Meeting CPP June 18, 2020] | *** [https://halldweb.jlab.org/wiki/index.php/June_18,_2020_CPP_Design_Meeting CPP June 18, 2020] | ||
** Electronics and Firmware (Fernando) | ** Electronics and Firmware (Fernando) | ||
− | ** Beamline Status [[BLTWG_Meeting_06/ | + | ** Beamline Status (cancelled) last meeting: [[BLTWG_Meeting_06/09/2020 | June 9, 2020]] (Richard) |
** Tracking [[Meeting-6-25-2020 | June 25, 2020]] (Naomi/Lubomir) | ** Tracking [[Meeting-6-25-2020 | June 25, 2020]] (Naomi/Lubomir) | ||
** DIRC: last meeting: [[June_8,_2020_DIRC | June 8, 2020]] (Justin) | ** DIRC: last meeting: [[June_8,_2020_DIRC | June 8, 2020]] (Justin) |
Revision as of 13:59, 1 July 2020
Contents
Meeting Coordinates
The meeting will be on Thursday July 2, 2020 at 11:00 AM EDT.
Connecting
- To join via a Web Browser, go to the page [1] https://bluejeans.com/660743227.
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 660743227.
- To join via phone, use one of the following numbers and the Conference ID: 660743227.
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- Upon connection all microphones are automatically muted. To unmute your mike on a Polycom or equivalent unit, enter *4. Unmuting on a computer is trivial as there is a microphone button than can be clicked.
- More information on connecting to bluejeans is available.
Agenda
- Announcements
- bylaws amended; new gluex.org website is live
- DOE Science and Technology Review next week
- October meeting: trying to reserve auditorium for October 22-24, but virtual meeting is looking increasingly likely; aim to make final decision in August
- Hall D Status (Tim/Eugene)
- shift preparations (Beni)
- run planning meetings: Monday at 8:45 (Alexandre)
- Status of GlueX-II data production (Igal)
- PrimEx reconstruction plans (Sasha)
- monitoring and calibration update
- schedule for production
- PAC proposals
- all documents have been submitted
- GDH proposal has been endorsed
- upcoming endorsement votes:
- SRC proposal: response to review (signal simulation) in progress
- Efforts to enhance collaboration
- GlueX photobook, login to portal and click "people" (Naomi)
- meeting of grad students and postdocs (Jon/Rebecca)
- committee to address diversity, equity, and inclusion: Naomi (chair), Tolga, Olga, Igal, Mike McCracken
- Specific areas where specialized help is needed
- Simulation needs: generating samples, OSG issues, updating smearing, ... (Sean)
Additional brief reports from working groups as needed
- Software and Analysis
- Production and Analysis Working Group: July 11, 2020 (Alex)
- Offline Meeting (cancelled) last meeting: June 9, 2020 (Mark)
- Particle ID Working Group: June 30, 2020 (Simon)
- Topical meetings
- Physics Working Group: last meeting was May 26, 2020 (Sean)
- Status of papers under review
- Amplitude Analysis Working Group: June 29, 2020 (Alex A.)
- Cross-section Working Group: June 29, 2020 (Justin)
- Beam Asymmetry Working Group: June 22, 2020 (Zisis)
- PrimEx Working Group: June 26, 2020 (Sasha)
- Di-lepton Working Group: June 25, 2020 (Sean)
- Physics Working Group: last meeting was May 26, 2020 (Sean)
- Hardware Working Groups:
- Engineering Activities: FCAL-II, CPP, other (Tim)
- last meeting: FCAL 2 February 26, 2020
- CPP June 18, 2020
- Electronics and Firmware (Fernando)
- Beamline Status (cancelled) last meeting: June 9, 2020 (Richard)
- Tracking June 25, 2020 (Naomi/Lubomir)
- DIRC: last meeting: June 8, 2020 (Justin)
- Online Systems: DAQ, Controls, Monitoring (Sergey/Hovanes)
- Trigger (Sasha)
- Calorimetry June 25, 2020 (Zisis/Elton)
- JEF June 26, 2020 (Simon/Liping/Sasha)
- Start Counter: June 25, 2020 (Mark I.)
- TOF: July 1, 2020 (Mark I.)
- Engineering Activities: FCAL-II, CPP, other (Tim)