Difference between revisions of "Analysis shift"

From GlueXWiki
Jump to: navigation, search
Line 2: Line 2:
  
 
[https://docs.google.com/spreadsheets/d/1GwJIKMZQ-tSzgZjwDQ_ZYryQzpIToaD5fivZMowkITA/edit?usp=sharing Sign Up for Analysis Shifts]
 
[https://docs.google.com/spreadsheets/d/1GwJIKMZQ-tSzgZjwDQ_ZYryQzpIToaD5fivZMowkITA/edit?usp=sharing Sign Up for Analysis Shifts]
<br>Shifts are 12 hours. They encouraged to be taken on site, but they may be taken remotely with connection to the Counting House.
+
<br>Shifts are 12 hours. They encouraged to be taken on site, but they may be taken remotely with connection to the Counting House (join [https://bluejeans.com/348194990/1111 here]).
 
* Responsible for:  
 
* Responsible for:  
 
** Checking data coming in from monitoring ([https://halldweb.jlab.org/data_monitoring/Plot_Browser.html plot browser]),
 
** Checking data coming in from monitoring ([https://halldweb.jlab.org/data_monitoring/Plot_Browser.html plot browser]),

Revision as of 14:54, 10 November 2021

Analysis Shift

Sign Up for Analysis Shifts
Shifts are 12 hours. They encouraged to be taken on site, but they may be taken remotely with connection to the Counting House (join here).



CC Room 306 is ours to use throughout the experiment for collaboration and work.
Daily Analysis meeting at 2pm EST (CC room 326): https://bluejeans.com/773909590/1171


Summary Physics Shift Analysis

List of good production runs

  • updated until: 90064
  • By radiator:
    • amorphous radiator: 90034-90039, 90045, 90062
    • diamond radiator: 90051, 90059, 90061, 90063-90064

List of trigger configurations

  • FCAL_BCAL_PS_SRC_m9.conf
    • Bit 1: FCAL (250 MeV) + BCAL (200 MeV) & ST
    • Bit 2: FCAL (4 GeV ) + BCAL (1.3 GeV)
    • Bit 3: PS