Difference between revisions of "April 22, 2010 Readout"

From GlueXWiki
Jump to: navigation, search
(Tentative Agenda)
Line 14: Line 14:
 
# Fill out loan agreement for SiPM arrays at UofR (Elton).
 
# Fill out loan agreement for SiPM arrays at UofR (Elton).
 
# Start a bulleted list of testing for the SiPMs (Serguey).
 
# Start a bulleted list of testing for the SiPMs (Serguey).
# Dynamic range of signals to sensor and electronics (Andrei).
+
# <strike> Dynamic range of signals to sensor and electronics (Andrei). </strike>
  
 
= Documents to Review=
 
= Documents to Review=
Line 31: Line 31:
 
= Minutes =
 
= Minutes =
 
Attending:
 
Attending:
 +
 +
 +
= Tentative Agenda =
 +
 +
# Announcements
 +
# Review of Action Items
 +
# Update - USM
 +
# Simulation runs (Gluex-doc-1474)
 +
# Geometry
 +
# [[SiPM Radiation Hardness Test]]  (Yi)
 +
# SiPM - Testing Schedules
 +
# Light guides

Revision as of 17:25, 22 April 2010

Teleconference Time: 11:00 a.m. EST

  • ESNET and EVO session
  • Phone in CC F326 is 757-269-6337
  • Phone:
    • +1-800-377-8846 : US
    • +1-888-276-7715 : Canada
    • +1-302-709-8424 : International
    • then enter participant code: 77438230# (remember the "#"). Phone connection only upon request.

Items for followup from previous meeting

  1. Serguei agreed to send out a testing proposal for comments, including preliminary circuit designs and list of available equipment at USM for reference.
  2. Fill out loan agreement for SiPM arrays at UofR (Elton).
  3. Start a bulleted list of testing for the SiPMs (Serguey).
  4. Dynamic range of signals to sensor and electronics (Andrei).

Documents to Review

Tentative Agenda

  1. Announcements
  2. Review of Action Items
  3. Update - USM
  4. Simulation runs (Gluex-doc-1474)
  5. Geometry
  6. SiPM Radiation Hardness Test (Yi)
  7. SiPM - Testing Schedules
  8. Light guides

Minutes

Attending:


Tentative Agenda

  1. Announcements
  2. Review of Action Items
  3. Update - USM
  4. Simulation runs (Gluex-doc-1474)
  5. Geometry
  6. SiPM Radiation Hardness Test (Yi)
  7. SiPM - Testing Schedules
  8. Light guides