* Minutes from last meeting https://halldweb.jlab.org/wiki/index.php/April_2,_2020_CPP_Design_Meeting#Minutes_and_Action_Items
 
* Minutes from last meeting https://halldweb.jlab.org/wiki/index.php/April_2,_2020_CPP_Design_Meeting#Minutes_and_Action_Items
 
* Overall description https://halldweb.jlab.org/DocDB/0041/004180/006/CPP_update_oct19.pdf
 
* Overall description https://halldweb.jlab.org/DocDB/0041/004180/006/CPP_update_oct19.pdf
 +
* Rory's comments [[Media:Rory's_screen_shots.pdf]]
 +
* 3D model - show progress
 
* Alignment tolerances
 
* Alignment tolerances
 
** Relative to Beamline
 
** Relative to Beamline
Line 25: Line 27:
 
== Minutes and Action Items ==
 
== Minutes and Action Items ==
 
*Reviewed minutes of last meeting
 
*Reviewed minutes of last meeting
 +
* Need to notch steel at bottom to clear connectors -- Stephanie
 +
* Look at using a 90° connector -- Rory
 +
* Check gas line bending to clear beam left dark room -- Rory
 +
* Alignment requirements relative to BL - X&Y ±2mm, Z ±1cm
 +
** Met with survey - need to add x,y and z adjustments for the entire system to achieve this
 +
* Desire to have a small block of 5cm lead movable
 +
** can be a local adjustment
 +
** Ring with 7.5cm hole
 +
** ok to have 10cm thick where overlap is
 +
** Holes to be square with radius corner
 +
** Hole size should have 1mm precision
 +
** What should be the size of the hole in the large lead absorber?
 +
* Need to check repeatability of detector after moving FCAL platform
 +
* Develop a procurement plan for this FY -- Tim
 +
* Set up new meeting in 2 weeks

Latest revision as of 08:42, 29 April 2020

Meeting Time and Place =

Thursday April 23, 2020, 1:30pm Bluejeans https://bluejeans.com/710246635/3638?src=calendarLink

  • Present - Elton, Dave, Stephanie, Llya, Rory (remote)

Agenda

Minutes and Action Items

  • Reviewed minutes of last meeting
  • Need to notch steel at bottom to clear connectors -- Stephanie
  • Look at using a 90° connector -- Rory
  • Check gas line bending to clear beam left dark room -- Rory
  • Alignment requirements relative to BL - X&Y ±2mm, Z ±1cm
    • Met with survey - need to add x,y and z adjustments for the entire system to achieve this
  • Desire to have a small block of 5cm lead movable
    • can be a local adjustment
    • Ring with 7.5cm hole
    • ok to have 10cm thick where overlap is
    • Holes to be square with radius corner
    • Hole size should have 1mm precision
    • What should be the size of the hole in the large lead absorber?
  • Need to check repeatability of detector after moving FCAL platform
  • Develop a procurement plan for this FY -- Tim
  • Set up new meeting in 2 weeks