Difference between revisions of "April 23, 2020 CPP Design Meeting"

From GlueXWiki
Jump to: navigation, search
(Created page with "= Meeting Time and Place == Thursday April 23, 2020, 1:30pm Bluejeans https://bluejeans.com/710246635/3638?src=calendarLink * Present - Elton, Dave, Stephanie, Llya, Rory (re...")
 
(Agenda)
Line 8: Line 8:
 
* Minutes from last meeting https://halldweb.jlab.org/wiki/index.php/April_2,_2020_CPP_Design_Meeting#Minutes_and_Action_Items
 
* Minutes from last meeting https://halldweb.jlab.org/wiki/index.php/April_2,_2020_CPP_Design_Meeting#Minutes_and_Action_Items
 
* Overall description https://halldweb.jlab.org/DocDB/0041/004180/006/CPP_update_oct19.pdf
 
* Overall description https://halldweb.jlab.org/DocDB/0041/004180/006/CPP_update_oct19.pdf
* 3D model
+
* Alignment tolerances
 +
** Relative to Beamline
 +
*** Steel Absorbers, x,y,z
 +
*** Lead Absorber, x,y,z
 +
*** Detectors, x,y,z
 +
** Relative to one another
 +
** Repeatability
 
* Things to work out
 
* Things to work out
 
** Electronics shielding [[Media:Muon_Chamber_Shielding.pdf]]
 
** Electronics shielding [[Media:Muon_Chamber_Shielding.pdf]]

Revision as of 08:28, 23 April 2020

Meeting Time and Place =

Thursday April 23, 2020, 1:30pm Bluejeans https://bluejeans.com/710246635/3638?src=calendarLink

  • Present - Elton, Dave, Stephanie, Llya, Rory (remote)

Agenda

Minutes and Action Items

  • Reviewed minutes of last meeting
  • We looked at Rory's pictures and discussed the 3D model that Stephanie shared
  • looking at space on platform, we decided to leave the vertical cable managers so we have some space margin in the future
  • Need to develop a dimensional layout of 3D model -- Stephanie
    • Note: The chamber currently in the hall has different thickness dimensions than the new ones
    • New chambers are 2.09" thick skin to skin
  • Need to develop an installation procedure -- Tim/Stephanie
  • Need to separate the 2 DS chambers for the electronics RF shielding
    • Rory to supply the gauge and dimensions of the shield
    • Stephanie to update geometry in 3D model
  • Floor rail system design needed to allow CPP to move along with the FCAl platform
    • Tim to supply sketch
    • Stephanie to create 3D model and drawings
  • Dark Room Structure
    • Tim to supply sketch for structural needs
    • Stephanie to update 3D model and create drawings
    • New structural members need to be installed before skin removal
  • Next meeting to be 1:30 to avert a time conflict