Difference between revisions of "April 23, 2024 KLONG CPS Design Meeting"
From GlueXWiki
(→Agenda) |
|||
(5 intermediate revisions by the same user not shown) | |||
Line 9: | Line 9: | ||
* Review new basic 3D model | * Review new basic 3D model | ||
** Copper Absorber translatable model to Fluka? | ** Copper Absorber translatable model to Fluka? | ||
+ | ** New radiation levels? Pavel | ||
** Layout of magnet and components (Stephanie/Keith) | ** Layout of magnet and components (Stephanie/Keith) | ||
+ | *** Combined support for magnet and absorber | ||
+ | *** possible moving plan https://www.aerogo.com/products/air-caster-rigging-system/ | ||
* Power supply status - On order, due March 2025 | * Power supply status - On order, due March 2025 | ||
* Magnet update (Josh/Stephanie) | * Magnet update (Josh/Stephanie) | ||
Line 15: | Line 18: | ||
* Copper cooling update - [[media:CPS Absorber cooling 8 offset holes.pdf]] [[media:CPS Absorber cooling 8 offset holes_2.pdf]] | * Copper cooling update - [[media:CPS Absorber cooling 8 offset holes.pdf]] [[media:CPS Absorber cooling 8 offset holes_2.pdf]] | ||
** Perform Brazing test | ** Perform Brazing test | ||
+ | ** Lead brick painting should be out for bid this week | ||
* DeGauss test summer 2024 | * DeGauss test summer 2024 | ||
== Minutes == | == Minutes == | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
== Action Items == | == Action Items == |
Revision as of 10:43, 23 April 2024
Meeting Time and Place
Tuesday, April 23, 2024, 1:15pm Hall D Counting House
- Invited - Hovanes Egiyan, Stephanie Worthington, Keith Harding, Pavel Degtiarenko, Tim Whitlatch, Eugene Chudakov, Josh Ballard
Agenda
- Review minutes from last meeting https://halldweb.jlab.org/wiki/index.php/April_09,_2024_KLONG_CPS_Design_Meeting
- Review new basic 3D model
- Copper Absorber translatable model to Fluka?
- New radiation levels? Pavel
- Layout of magnet and components (Stephanie/Keith)
- Combined support for magnet and absorber
- possible moving plan https://www.aerogo.com/products/air-caster-rigging-system/
- Power supply status - On order, due March 2025
- Magnet update (Josh/Stephanie)
- Can we use less expensive resin? What is the actual expected radiation levels at coils now?
- Copper cooling update - media:CPS Absorber cooling 8 offset holes.pdf media:CPS Absorber cooling 8 offset holes_2.pdf
- Perform Brazing test
- Lead brick painting should be out for bid this week
- DeGauss test summer 2024