###The Rohacell ring has been dryfitted, that was a very nice fit.  The chamber is suspended by its support brackets and the flange has been removed from the pipe prior to dry-fitting of the Al ring (upstream plenum inner hub).  The cheeseplate is ready to go on when the Al ring is in place, its standoffs are already in place.  Holes have been drilled in the endplates for the thermocouples; these have been installed at the upstream end.
 
###The Rohacell ring has been dryfitted, that was a very nice fit.  The chamber is suspended by its support brackets and the flange has been removed from the pipe prior to dry-fitting of the Al ring (upstream plenum inner hub).  The cheeseplate is ready to go on when the Al ring is in place, its standoffs are already in place.  Holes have been drilled in the endplates for the thermocouples; these have been installed at the upstream end.
 
###Naomi finished a wiring map plan for the CDC (linked to the agenda), mostly 3 rows of straws per board, with the straws with longest wires swapped onto nearer boards to reduce their length resulting in ~50 boards with 1 straw from a 4th row, and estimated mean wire length approximately 4.1in.
 
###Naomi finished a wiring map plan for the CDC (linked to the agenda), mostly 3 rows of straws per board, with the straws with longest wires swapped onto nearer boards to reduce their length resulting in ~50 boards with 1 straw from a 4th row, and estimated mean wire length approximately 4.1in.
 +
##Prototype
 
###Following the discussion last week Naomi changed the CDC prototype triggering so that one scintillator signal completely covers the other (not just the leading edge of the other) but the lumps in the drift time spectrum are still there. (See pale teal green histogram very close to the end of [[CDC_prototype_more_on_timing_3]]).
 
###Following the discussion last week Naomi changed the CDC prototype triggering so that one scintillator signal completely covers the other (not just the leading edge of the other) but the lumps in the drift time spectrum are still there. (See pale teal green histogram very close to the end of [[CDC_prototype_more_on_timing_3]]).
 
###Lubomir suggested checking the preamp voltage as he found that correcting this reduced the event signal tails.
 
###Lubomir suggested checking the preamp voltage as he found that correcting this reduced the event signal tails.

Revision as of 11:55, 25 April 2012

Meeting Time and Place

Wednesday April 25, 2012 at 11:00am At Jefferson Lab, the meeting will be held in F326

Connections

To connect from the outside, please use ESNET

  1. ) ESNET: 8542553
  2. )To connect by telephone, dial:
  • You can look up toll-free number at http://www.readytalk.com/intl
  • US and Canada: (866)740-1260 (toll free)
  • International: (303)248-0285 (toll call)
  • enter access code followed by the # sign: 3421244#

Hardware Agenda

  1. Announcements
  2. Collaboration Meeting
  3. FDC Update logbook
  4. CDC Update
    1. Construction Update planned HVB wiring map
    2. Cosmic Calibration of the Chamber
  5. TDR Update

Tracking Software Agenda

  1. Announcements.
  2. Summary of current work on tracking.
    1. Hit pruning and broken track recovery has been improved
      1. Pruning cut (distance in σ between projection of track and hit) is iteration dependent (currently starts at 30σ and goes down to a minimum value of 3σ)
      2. Single track reconstruction before recent changes
      3. Single track reconstruction after recent changes
    2. Spiral Track Update (Paul)
  3. Where we need to focus work (Discussion)?

Hardware Minutes

Participants: Curtis, Naomi, Eugene, Beni, John, Simon, Lubomir

  1. FDC Update
  2. CDC Update
    1. Construction Update
      1. The Rohacell ring has been dryfitted, that was a very nice fit. The chamber is suspended by its support brackets and the flange has been removed from the pipe prior to dry-fitting of the Al ring (upstream plenum inner hub). The cheeseplate is ready to go on when the Al ring is in place, its standoffs are already in place. Holes have been drilled in the endplates for the thermocouples; these have been installed at the upstream end.
      2. Naomi finished a wiring map plan for the CDC (linked to the agenda), mostly 3 rows of straws per board, with the straws with longest wires swapped onto nearer boards to reduce their length resulting in ~50 boards with 1 straw from a 4th row, and estimated mean wire length approximately 4.1in.
    2. Prototype
      1. Following the discussion last week Naomi changed the CDC prototype triggering so that one scintillator signal completely covers the other (not just the leading edge of the other) but the lumps in the drift time spectrum are still there. (See pale teal green histogram very close to the end of CDC_prototype_more_on_timing_3).
      2. Lubomir suggested checking the preamp voltage as he found that correcting this reduced the event signal tails.