Wednesday April 27, 2011 at 11:00am At Jefferson Lab, the meeting will be held in F326

Connections

To connect from the outside, please use ESNET

  1. ) ESNET: 8542553
  2. )To connect by telephone, dial:
  • You can look up toll-free number at http://www.readytalk.com/intl
  • US and Canada: (866)740-1260 (toll free)
  • International: (303)248-0285 (toll call)
  • enter access code followed by the # sign: 3421244#

Agenda

  1. Announcements
  2. FDC Update
  3. CDC Update
    1. Status of the Construction.
    2. Update on straw tubes?
    3. Status of the hook-up wires.
    4. Newest_preamp

Minutes

Participants: Curtis, Naomi, Beni, Lubomir, Simon, Dave, Eugene, Tim

FDC Update

CDC Update

  1. Status of the construction

Row 19 is complete. Tim reported that the outer shells have arrived at JLab, have been cleaned and deburred and will be shipped to CMU in the next few days.

  1. Status of the straws

We have run out of straws. Patrick had emailed that he has the new material and estimated that all being well, he should have the straws ready for shipping soon after May 8.

  1. Hook-up wires

Upon returning to the supplier for the terminators the price had risen dramatically and so we are reverting to an earlier design for the hook-up wires, using a lugged ferrule. Curtis will sent Tim drawings. It might be possible to shrink the PCB slightly and splaying out the connection points would make it easier to work with. About 20% of the hookup wires have been made - for one end of each wire we require the O-ring and bushing. Tim said the ferrules were ordered around 3 weeks ago.

  1. Preamp