Difference between revisions of "April 30, 2021 DIRC"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
 
(2 intermediate revisions by the same user not shown)
Line 17: Line 17:
  
 
# Announcements
 
# Announcements
 +
#* [https://halldweb.jlab.org/wiki/index.php/GlueX-Collaboration-May-2021 Collaboration Meeting May 24-28]
 +
#* [https://indico.cern.ch/event/981823/contributions/4295307/ Roman's TIPP contribution May 25]
 
# [https://halldweb.jlab.org/wiki/index.php/Mirror_prototype_test_plan#Proposed_prototypes Mirror prototype test plan] (All)
 
# [https://halldweb.jlab.org/wiki/index.php/Mirror_prototype_test_plan#Proposed_prototypes Mirror prototype test plan] (All)
 
#* Discussion of prototypes and ongoing tests (Bill, All)
 
#* Discussion of prototypes and ongoing tests (Bill, All)
 
#** [https://logbooks.jlab.org/entry/3875062 Inspection on 4/28]
 
#** [https://logbooks.jlab.org/entry/3875062 Inspection on 4/28]
 
#* Next steps in mirror process: (Justin)
 
#* Next steps in mirror process: (Justin)
#** Borofloat received at JLab and mirrors cut this week
+
#** Borofloat received and checked at JLab and mirrors at Danny's for cutting
#** Writeup of assembly procedure
+
#** Writeup of assembly procedure discussed last week
 +
#*** After etching, large mirrors will be taped to strongback, where borofloat will be attached.  Full strongback + mirror sandwich tested under water
 +
#*** Narrow mirrors (3-segment and "wedge" mirrors) will be assembled on optical breadboards and tested under water before taping to strongback.
 
# DIRC commissioning analyses and 2020 studies (All)
 
# DIRC commissioning analyses and 2020 studies (All)
 
#* [https://halldweb.jlab.org/wiki-private/index.php/Spring_2020_Dataset_Summary#Full_REST_Production Spring 2020 data production status]: all 8 batches nearly complete for REST reconstruction (Justin)
 
#* [https://halldweb.jlab.org/wiki-private/index.php/Spring_2020_Dataset_Summary#Full_REST_Production Spring 2020 data production status]: all 8 batches nearly complete for REST reconstruction (Justin)
 
#** [https://halldweb.jlab.org/wiki-private/index.php/Spring_2020_Analysis_Launch Analysis launches]
 
#** [https://halldweb.jlab.org/wiki-private/index.php/Spring_2020_Analysis_Launch Analysis launches]
#* Geometric reconstruction update
+
#* Geometric reconstruction update (Roman)
 
#* Cherenkov PDF (Ahmed)  
 
#* Cherenkov PDF (Ahmed)  
 
#* FastDIRC update (Yunjie)
 
#* FastDIRC update (Yunjie)
 
# AOB
 
# AOB

Latest revision as of 09:58, 30 April 2021

Meeting Information

GlueX DIRC Meeting
Friday April 30, 2021
10:00 am, ET
Remote only

Connection Using Bluejeans

  1. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
  2. To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
  3. To join via phone, use one of the following numbers and the Conference ID: 846453895
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. More information on connecting to bluejeans is available.

Agenda

  1. Announcements
  2. Mirror prototype test plan (All)
    • Discussion of prototypes and ongoing tests (Bill, All)
    • Next steps in mirror process: (Justin)
      • Borofloat received and checked at JLab and mirrors at Danny's for cutting
      • Writeup of assembly procedure discussed last week
        • After etching, large mirrors will be taped to strongback, where borofloat will be attached. Full strongback + mirror sandwich tested under water
        • Narrow mirrors (3-segment and "wedge" mirrors) will be assembled on optical breadboards and tested under water before taping to strongback.
  3. DIRC commissioning analyses and 2020 studies (All)
  4. AOB