Aug 11, 2011 SiPM Electrical and Cooling

From GlueXWiki
Revision as of 16:52, 4 August 2011 by Elton (Talk | contribs) (Action Items from previous meetings)

Jump to: navigation, search

Action Items from previous meetings

  1. Add hardware voltage limits to bias circuit (Jack)
  2. Reset devices when communication errors are encountered in control loop (Yi)
  3. Send Jim the dxf file of the U board with the new capacitors to check mechanical fit. (Chris)
  4. Hood in EEL 126 is being removed (Jack will check on status)

Tentative Agenda

  1. Announcements
  2. Action Items
  3. Schedule, reporting, and manpower (Elton)
  4. SiPM testing (Carl and Yi)
  5. Mechanical (Jim)
  6. Mechanical drawings (Chuck)
  7. Geometry (Elton)
  8. Temperature compensation (Jack)
  9. Preamp-summing (Fernando)

Minutes

Attending: