Difference between revisions of "Aug 21, 2012 Readout"

From GlueXWiki
Jump to: navigation, search
(Tentative Agenda)
(Tentative Agenda)
Line 29: Line 29:
 
# Update from USM
 
# Update from USM
 
# Status of testing at JLab
 
# Status of testing at JLab
# Beam Tests, Cosmics, Simulations
+
# Beam Tests, Cosmics
## [[BCAL Beam Tests 2012]]
+
# Simulations
## BCAL hdgeant (David L.)
+
## BCAL Cosmics at Regina
+
## Simulations
+
 
# Other
 
# Other
  
 
= Minutes =
 
= Minutes =
 
''Attending:
 
''Attending:

Revision as of 18:07, 20 August 2012

Teleconference Time: 11:00 a.m. EST

  • ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)
  • Phone connection only upon request.
    • +1-866-740-1260 : US and Canada
    • +1-303-248-0285 : International
    • then use participant code: 3421244# (the # is needed when using the phone)
    • OR from www.readytalk.com type access code 3421244 into "join a meeting" without the # (you need java plugin)

Participant Direct Lines

  • JLab Phone: in CC F326 is 757-269-6337 (usual room)
  • JLab Phone in CC L207 is 757-269-7084
  • Phone in the Regina Videoconference Suite is 306-585-4204
  • Athens Phone: in Christina's office is 011-30-210-727-6947

Items for followup from previous meeting

  • Elton to check light guide delays versus FastTrack and inform us if we are on a critical path.
    • Current light guide schedule about 3 months behind schedule baseline. Estimated time to glue guides is 10 weeks. Estimated completion is late Jan. -> impact schedule float, but not significantly.

Presentations from recent meetings

Tentative Agenda

  1. Announcements
  2. Review of Action Items
  3. Update from Athens: monitoring
  4. Update from USM
  5. Status of testing at JLab
  6. Beam Tests, Cosmics
  7. Simulations
  8. Other

Minutes

Attending: