Aug 21, 2012 Readout

From GlueXWiki
Revision as of 18:04, 20 August 2012 by Elton (Talk | contribs) (Items for followup from previous meeting)

Jump to: navigation, search

Teleconference Time: 11:00 a.m. EST

  • ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)
  • Phone connection only upon request.
    • +1-866-740-1260 : US and Canada
    • +1-303-248-0285 : International
    • then use participant code: 3421244# (the # is needed when using the phone)
    • OR from www.readytalk.com type access code 3421244 into "join a meeting" without the # (you need java plugin)

Participant Direct Lines

  • JLab Phone: in CC F326 is 757-269-6337 (usual room)
  • JLab Phone in CC L207 is 757-269-7084
  • Phone in the Regina Videoconference Suite is 306-585-4204
  • Athens Phone: in Christina's office is 011-30-210-727-6947

Items for followup from previous meeting

  • Elton to check light guide delays versus FastTrack and inform us if we are on a critical path.
    • Current light guide schedule about 3 months behind schedule baseline. Estimated time to glue guides is 10 weeks. Estimated completion is late Jan. -> impact schedule float, but not significantly.

Presentations from recent meetings

Tentative Agenda

  1. Announcements
  2. Review of Action Items
  3. Update from Athens: monitoring
    • Initial version of support
  4. Update from USM
    1. SiPM Update (Javiera)
    2. Operational Voltage (Orlando)
    3. Light guides]] (Iñaki)
    4. Impacts of pixelation and cross-talk on signal linearity (Sergey)
  5. Status of testing at JLab
    1. Hall-D ELOG.
    2. Optimal bias voltage (Yi Qiang)
  6. Beam Tests, Cosmics, Simulations
    1. BCAL Beam Tests 2012
    2. BCAL hdgeant (David L.)
    3. BCAL Cosmics at Regina
    4. Simulations
  7. Other

Minutes

Attending: