Aug 21, 2012 Readout

From GlueXWiki
Revision as of 14:54, 21 August 2012 by Elton (Talk | contribs)

Jump to: navigation, search

Teleconference Time: 11:00 a.m. EST

  • ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)
  • Phone connection only upon request.
    • +1-866-740-1260 : US and Canada
    • +1-303-248-0285 : International
    • then use participant code: 3421244# (the # is needed when using the phone)
    • OR from www.readytalk.com type access code 3421244 into "join a meeting" without the # (you need java plugin)

Participant Direct Lines

  • JLab Phone: in CC F326 is 757-269-6337 (usual room)
  • JLab Phone in CC L207 is 757-269-7084
  • Phone in the Regina Videoconference Suite is 306-585-4204
  • Athens Phone: in Christina's office is 011-30-210-727-6947

Items for followup from previous meeting

  • Elton to check light guide delays versus FastTrack and inform us if we are on a critical path.
    • Current light guide schedule about 3 months behind schedule baseline. Estimated time to glue guides is 10 weeks. Estimated completion is late Jan. -> impact schedule float, but not significantly.

Presentations from recent meetings

Tentative Agenda

  1. Announcements
  2. Review of Action Items
  3. Update from Athens: monitoring
  4. Update from USM
    1. SiPM Update (Javiera)
    2. Light guides (Iñaki)
  5. Status of testing at JLab
  6. Beam Tests, Cosmics
  7. Simulations
  8. Other

Minutes

Attending:Elton, Beni, Yi, Eugene, David (JLab); Zisis, Andrei (UofR); Javiera, Hayk, Iñaki, Alam, Kuleshov (USM).

  1. Announcements
  2. Review of Action Items
  3. Update from Athens: monitoring
    • Fernando has approved the drawings for the Fcal monitoring.
    • Elton: My understanding is that all parts are in for the Bcal boards. Stuffing and assembly will begin next Monday.
  4. Update from USM
    1. SiPM Update (Javiera)
      • Third shipment of 520 SiPMs to JLab on Aug 31. Paperwork to smooth deliveries is underway.
      • Zisis: Add expected completion date for each line in the table based on progress.
      • Elton: Provide histograms of all measured units for each specification at T=20 deg C and V=1.2 V above breakdown.
      • Elton: Send dump of data base. Hayk: Suggest to send the dump on a disk with the next shipment.
    2. Light guides (Iñaki)
  5. Status of testing at JLab
  6. Beam Tests, Cosmics
  7. Simulations
  8. Other