Difference between revisions of "Aug 29, 2014 Design Meeting"

From GlueXWiki
Jump to: navigation, search
(Created page with "== Meeting Time and Place == Friday August 29, 2014 at 8:15am At Jefferson Lab, room TED 2504 == Agenda == * ESH&Q minute - Media:ARR.pdf ** Do not remove any material fr...")
 
m (Text replacement - "hdops.jlab.org/wiki" to "halldweb.jlab.org/hdops/wiki")
 
(5 intermediate revisions by 2 users not shown)
Line 6: Line 6:
 
== Agenda ==
 
== Agenda ==
 
* ESH&Q minute -  [[Media:ARR.pdf]]
 
* ESH&Q minute -  [[Media:ARR.pdf]]
** Do not remove any material from the tagger building without RADCON approval unless you brought it in there after beam
+
** Small stuff matters
* GD&T training - thoughts?
+
* Training
 +
** GD&T training - continue
 +
** Ansys
 +
** Others?
 
* NX update
 
* NX update
 
* Accelerator Readiness Review - Aug 26
 
* Accelerator Readiness Review - Aug 26
* Work list [[Media:Hall D Tasks Jul24 2014.pdf]]
+
* Beam to Hall Sept 29? [[Media:Remaining work schedule aug 2014.pdf]]\
 +
* Future manpower supported by Physics operations
 +
** 1.5 - 2 Engineers (including Tim)
 +
** 0.5 - 2 Designers
 
* Hot Check Out https://accweb.acc.jlab.org/hco/checklists
 
* Hot Check Out https://accweb.acc.jlab.org/hco/checklists
* Hall D operations  https://hdops.jlab.org/wiki/index.php/Information_for_Experts
+
* Hall D operations  https://halldweb.jlab.org/hdops/wiki/index.php/Information_for_Experts
* Hall D Maintenance Log  https://halldweb1.jlab.org/cgi-bin/maintenance/cgi/status.pl
+
* Hall D Maintenance Log  https://halldweb.jlab.org/cgi-bin/maintenance/cgi/status.pl
 
* Possible new detectors
 
* Possible new detectors
 
**  DIRC - (Cherenkov between solenoid and TOF)
 
**  DIRC - (Cherenkov between solenoid and TOF)
 
**  Pion detector - downstream of FCAL (on platform)
 
**  Pion detector - downstream of FCAL (on platform)

Latest revision as of 20:17, 31 March 2015

Meeting Time and Place

Friday August 29, 2014 at 8:15am At Jefferson Lab, room TED 2504

Agenda