Difference between revisions of "August 14, 2015 PID Upgrade"

From GlueXWiki
Jump to: navigation, search
(Agenda)
Line 23: Line 23:
 
# [[DIRC Review Meeting | Planning for October review]] (All)
 
# [[DIRC Review Meeting | Planning for October review]] (All)
 
# AOB
 
# AOB
 +
 +
== Minutes ==
 +
 +
Attending: Mike, John, Cristiano (MIT), Curtis (CMU), Matt, Justin (JLab)
 +
 +
# Mechanical structure and shipping crate (Matt) [[Media:Mech_dirc_update_0814.pdf | Figures]]
 +
#* Matt reviewed some figures of the support structure design that John F has been developing at IU.
 +
# [[DIRC Review Meeting | Planning for October review]] (All)
 +
#* We spent most of the meeting discussing the status of the TDR
 +
 +
# Post-meeting:
 +
#* I talked with Patrizia Rossi about the "Program Management" aspect of the review, and she provided some documents for use to compare with.
 +
#** Project Management talk from the initial RICH review
 +
#** Project Management document finalized ~6 months after the initial RICH review
 +
#* The essential pieces we need to have prepared for the DIRC review are
 +
#*# Project timeline with well defined milestones and contingencies (eg. when will the bar boxes be transported from SLAC?)
 +
#*# Detailed budget for procurement and expenditures for each fiscal year (and maybe quarterly)

Revision as of 15:24, 14 August 2015

Meeting Information

GlueX PID Upgrade Meeting
Friday, August 14, 2015
11 am, EDT
For those people at Jefferson Lab, the meeting will be in room F326

Connection Using Bluejeans

  1. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
  2. To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
  3. To join via phone, use one of the following numbers and the Conference ID: 846453895
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. More information on connecting to bluejeans is available.

Agenda

  1. Announcements
  2. Focusing optics and mirror status (John/Mike)
  3. Mechanical structure and shipping crate (Matt) Figures
  4. Readout (Justin)
  5. Planning for October review (All)
  6. AOB

Minutes

Attending: Mike, John, Cristiano (MIT), Curtis (CMU), Matt, Justin (JLab)

  1. Mechanical structure and shipping crate (Matt) Figures
    • Matt reviewed some figures of the support structure design that John F has been developing at IU.
  2. Planning for October review (All)
    • We spent most of the meeting discussing the status of the TDR
  1. Post-meeting:
    • I talked with Patrizia Rossi about the "Program Management" aspect of the review, and she provided some documents for use to compare with.
      • Project Management talk from the initial RICH review
      • Project Management document finalized ~6 months after the initial RICH review
    • The essential pieces we need to have prepared for the DIRC review are
      1. Project timeline with well defined milestones and contingencies (eg. when will the bar boxes be transported from SLAC?)
      2. Detailed budget for procurement and expenditures for each fiscal year (and maybe quarterly)