Difference between revisions of "August 19, 2021 KLONG Design Meeting"

From GlueXWiki
Jump to: navigation, search
(Created page with "== Meeting Time and Place == Thursday August 19, 2021, 1pm Bluejeans https://bluejeans.com/465620466 * Present - Hovanes Egiyan, Moskov Amaryan, Stephanie Worthington, Keith...")
 
(Minutes and Action Items)
Line 20: Line 20:
  
 
== Minutes and Action Items ==
 
== Minutes and Action Items ==
 
+
* Looking at 3D model of collimator cave. The 2 partial shield walls should have 10 cm lead on the downstream face of the concrete
 +
* discussed using 6 cm beampipe through wall at the mouth of the collimator cave. Need to make sure we can fit this.
 +
* decided to use aluminum windows to isolate the vacuum in the beamline. 250 microns ok
 +
* 10 cm distance from beryllium target to downstream vacuum window of.
 +
* we will need to remove the vacuum chamber from the pair spec magnet and replace with a 6cm beam pipe
 +
* use 5mm gap between beryllium and tungsten
 +
* Received quotes for $28K and $11K for 98% pure beryllium, ok to use as little as 90% pure, will seek an additional quote
 +
* need to look at thermal conductivity of whatever beryllium alloy is used
 +
* Moskov asked if we should plan for 24 GeV beam requirement. Eugene thought this should be treated separately.
  
 
== Action Items ==
 
== Action Items ==

Revision as of 07:58, 2 September 2021

Meeting Time and Place

Thursday August 19, 2021, 1pm Bluejeans https://bluejeans.com/465620466

  • Present - Hovanes Egiyan, Moskov Amaryan, Stephanie Worthington, Keith Harding, Igor Strakovsky, Tim Whitlatch, Mark Stevens

Agenda

Minutes and Action Items

  • Looking at 3D model of collimator cave. The 2 partial shield walls should have 10 cm lead on the downstream face of the concrete
  • discussed using 6 cm beampipe through wall at the mouth of the collimator cave. Need to make sure we can fit this.
  • decided to use aluminum windows to isolate the vacuum in the beamline. 250 microns ok
  • 10 cm distance from beryllium target to downstream vacuum window of.
  • we will need to remove the vacuum chamber from the pair spec magnet and replace with a 6cm beam pipe
  • use 5mm gap between beryllium and tungsten
  • Received quotes for $28K and $11K for 98% pure beryllium, ok to use as little as 90% pure, will seek an additional quote
  • need to look at thermal conductivity of whatever beryllium alloy is used
  • Moskov asked if we should plan for 24 GeV beam requirement. Eugene thought this should be treated separately.

Action Items