BCAL Reconstruction Meeting 2013-09-03

From GlueXWiki
Revision as of 11:30, 3 September 2013 by Davidl (Talk | contribs)

Jump to: navigation, search

Teleconference Time: 11:15 a.m. EDT

  • ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)
  • Phone connection only upon request.
    • +1-866-740-1260 : US+Canada
    • +1-303-248-0285 : International
    • then enter participant code: 3421244# (remember the "#").
    • or www.readytalk.com (and code without the #)

Participant Direct Lines

  • JLab Phone: in CC F326 is 757-269-6460 (usual room)
  • JLab Phone in CC L207 is 757-269-7084
  • Phone in the Regina Video-conference Suite is 306-585-4204

Action Items

  1. BCAL Reconstruction Issues
  2. BCAL Reconstruction Algorithms
  3. Will to check whether second cluster appears mostly in the outer layers, due to the "curving" of the shower.
  4. Introduce FPGA timing algorithm to derive hit times from fADC
  5. Gather reconstruction conditions for outer layers on the Wiki.

Agenda

  1. Action Items
  2. Updates
  3. Discuss and prioritize the Reconstruction Issues and produce a timetable for the work.
  4. Any other business

Minutes

Attendees: David L., George V., Zisis P., Will L.


Action Items

  • Will will move some items from wiki page into Mantis
  • Dave will remove "BCAL Reconstruction Algorithms" from Action Item list
  • Will checked this and saw that yes, we did see more cluster in the outer layers, but this is due to a combination of 1. greater noise due to more summed channels 2. poorer timing resolution and 3. "curvature" of the shower.
  • Dave needs to check BCAL calibration constant status (prepare slides for collaboration meeting of full data flow)

Updates

Discuss and prioritize the Reconstruction Issues and produce a timetable for the work

Any other business