Difference between revisions of "BLTWG Meeting 02/06/2012"
From GlueXWiki
(→Agenda) |
|||
(4 intermediate revisions by the same user not shown) | |||
Line 2: | Line 2: | ||
* Place: ESNET and EVO (with telephone bridge id 472 2913) | * Place: ESNET and EVO (with telephone bridge id 472 2913) | ||
* Connecting: instructions are [[Tagged Beam Group Biweekly Meetings|here]] | * Connecting: instructions are [[Tagged Beam Group Biweekly Meetings|here]] | ||
− | * Present: | + | * Present: Ken L., Barry R., Michael D., Igor S., Richard J., Yi Q., Tim W., Sascha S., Eugene C., and Ivan T. |
---- | ---- | ||
Line 8: | Line 8: | ||
# Announcements | # Announcements | ||
# [[GlueX-Collaboration-Feb-2012#Thursday_February_16.2C_2012|Assignment of collaboration meeting talks]] - ''Richard'' | # [[GlueX-Collaboration-Feb-2012#Thursday_February_16.2C_2012|Assignment of collaboration meeting talks]] - ''Richard'' | ||
+ | # UConn construction SOW, [http://zeus.phys.uconn.edu/~jonesrt/outbox/contract.xls draft budget] - ''Richard'' | ||
# Reports from working groups | # Reports from working groups | ||
#* Glasgow goniometer + ladder | #* Glasgow goniometer + ladder |
Latest revision as of 12:53, 6 February 2012
- Time: 11:30 EST
- Place: ESNET and EVO (with telephone bridge id 472 2913)
- Connecting: instructions are here
- Present: Ken L., Barry R., Michael D., Igor S., Richard J., Yi Q., Tim W., Sascha S., Eugene C., and Ivan T.
Agenda
- Announcements
- Assignment of collaboration meeting talks - Richard
- UConn construction SOW, draft budget - Richard
- Reports from working groups
- Glasgow goniometer + ladder
- UConn diamonds
- UConn electronics
- UConn microscope
- CUA hodoscope
- ASU polarimeter Study of accidentals
- UNCW/JLab pair counters
- JLab pair spectrometer, target