Difference between revisions of "BLTWG Meeting 02/06/2012"

From GlueXWiki
Jump to: navigation, search
(Agenda)
 
(4 intermediate revisions by the same user not shown)
Line 2: Line 2:
 
* Place: ESNET and EVO (with telephone bridge id 472 2913)  
 
* Place: ESNET and EVO (with telephone bridge id 472 2913)  
 
* Connecting: instructions are [[Tagged Beam Group Biweekly Meetings|here]]
 
* Connecting: instructions are [[Tagged Beam Group Biweekly Meetings|here]]
* Present:  
+
* Present: Ken L., Barry R., Michael D., Igor S., Richard J., Yi Q., Tim W., Sascha S., Eugene C., and Ivan T.
  
 
----
 
----
Line 8: Line 8:
 
# Announcements
 
# Announcements
 
# [[GlueX-Collaboration-Feb-2012#Thursday_February_16.2C_2012|Assignment of collaboration meeting talks]] - ''Richard''
 
# [[GlueX-Collaboration-Feb-2012#Thursday_February_16.2C_2012|Assignment of collaboration meeting talks]] - ''Richard''
 +
# UConn construction SOW, [http://zeus.phys.uconn.edu/~jonesrt/outbox/contract.xls draft budget] - ''Richard''
 
# Reports from working groups
 
# Reports from working groups
 
#* Glasgow goniometer + ladder
 
#* Glasgow goniometer + ladder

Latest revision as of 12:53, 6 February 2012

  • Time: 11:30 EST
  • Place: ESNET and EVO (with telephone bridge id 472 2913)
  • Connecting: instructions are here
  • Present: Ken L., Barry R., Michael D., Igor S., Richard J., Yi Q., Tim W., Sascha S., Eugene C., and Ivan T.

Agenda

  1. Announcements
  2. Assignment of collaboration meeting talks - Richard
  3. UConn construction SOW, draft budget - Richard
  4. Reports from working groups
    • Glasgow goniometer + ladder
    • UConn diamonds
    • UConn electronics
    • UConn microscope
    • CUA hodoscope
    • ASU polarimeter Study of accidentals
    • UNCW/JLab pair counters
    • JLab pair spectrometer, target

Notes