Difference between revisions of "BLTWG Meeting 08/25/2009"

From GlueXWiki
Jump to: navigation, search
Line 1: Line 1:
 
* Time: 11:00 EST
 
* Time: 11:00 EST
* Place: EVO and ESNET (with telephone bridge) <font color='red'>UConn connections problems have been solved!</font>
+
* Place: EVO and ESNET (with telephone bridge) <font color='red'>-- UConn connections problems have been solved!</font>
 
* Connecting: instructions are [[Tagged Beam Group Biweekly Meetings|here]]
 
* Connecting: instructions are [[Tagged Beam Group Biweekly Meetings|here]]
 
* Present:
 
* Present:

Revision as of 14:15, 24 August 2009

  • Time: 11:00 EST
  • Place: EVO and ESNET (with telephone bridge) -- UConn connections problems have been solved!
  • Connecting: instructions are here
  • Present:


Agenda

  1. Tagger magnetic field studies with Poisson - Igor
    1. magnetic field distortion study extended to 1.8T
    2. repeat previous studies with updated iron specs
    3. look at transverse components in the case of sloped poles
  2. Tagger magnetic field optics studies - Alex
  3. Response to JSA proposal for diamond work - Richard
  4. Work status reports - everyone
  5. Review agenda for beam section of collaboration meeting

Notes