Difference between revisions of "BLTWG Meeting 09/16/2013"

From GlueXWiki
Jump to: navigation, search
(Agenda)
m (Text replacement - "http://argus.phys.uregina.ca/cgi-bin/private" to "https://halldweb.jlab.org/doc-private")
 
(6 intermediate revisions by one other user not shown)
Line 10: Line 10:
 
# [[GlueX-Collaboration-Oct-2013|October Collaboration Meeting]]
 
# [[GlueX-Collaboration-Oct-2013|October Collaboration Meeting]]
 
# Update on mapping - ''Tim W.''
 
# Update on mapping - ''Tim W.''
# Update on microscope electronics - ''Alex B.''
 
 
# Update on pair spectrometer - ''Ivan T.''
 
# Update on pair spectrometer - ''Ivan T.''
# [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=2294 TAGH counter inspection and testing] - ''Franz K./Natalie W.''
+
# [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=2294 TAGH counter inspection and testing] - ''Franz K./Natalie W.''
 
# Update on goniometer testing - ''Yi Q.''
 
# Update on goniometer testing - ''Yi Q.''
 
# Update on clock signal - ''Eugene C.''
 
# Update on clock signal - ''Eugene C.''
# [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=2181 Status of the microscope construction] - ''James M.''
+
# Update on microscope electronics - ''Alex B.''
# Diamond thinning proposal - ''Jarrod F.''
+
# [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=2181 Status of the microscope construction] - ''James M.''
 +
# Diamond thinning proposal - ''Brenden/Jarrod F.''
 
#''any other business''
 
#''any other business''
 +
 +
===Minutes===
 +
# Mapping - ''Tim''
 +
## preparing mapping instrument for tagger magnet
 +
## repairing power supply for the pair spectrometer's magnet
 +
# Pair spectrometer - ''Ivan''
 +
## all parts are ready except for the fixture of the fibers, working with Chuck on design
 +
## working on slow control
 +
# Fixed array - ''Natalie/Franz''
 +
## received all scintillator bars with light guide glued
 +
## checked all of them, most of them are good
 +
## working on final design of the holder
 +
# Goniometer - ''Yi''
 +
## testing goniometer in FEL
 +
## verified minimum step sized: 0.2 mdeg in yaw and 0.1 mdeg in pitch
 +
## more test on reproducibility and optimize moving parameters
 +
# Accelerator Clock - ''Eugene''
 +
## trying to order cable for the signal form physics's FY14 budget: 26k for part and 14k for labor
 +
# Microscope - ''Alex B.''
 +
## production on track, will ship samples to JLab soon
 +
# Microscope construction - ''James''
 +
## a little bit late on first article, but the whole schedule and budget are still on track
 +
# Diamond thinning - ''Brenden/Jarrod''
 +
## restarting the thinning process
 +
## Jarrod working with Richard on the proposal

Latest revision as of 16:54, 24 February 2017

Organization

  • Time: 11:30 EST
  • Place: ESNET and Seevogh (Jlab community)
  • Connecting: instructions are here
  • Present: Natalie W., Jarrod F., Eugene C., Todd S., Ivan T., Tim W., Yi Q., Brenden P., Alex B., Ann C., James M., Curtis M., Franz K.

Agenda

  1. Announcements
  2. October Collaboration Meeting
  3. Update on mapping - Tim W.
  4. Update on pair spectrometer - Ivan T.
  5. TAGH counter inspection and testing - Franz K./Natalie W.
  6. Update on goniometer testing - Yi Q.
  7. Update on clock signal - Eugene C.
  8. Update on microscope electronics - Alex B.
  9. Status of the microscope construction - James M.
  10. Diamond thinning proposal - Brenden/Jarrod F.
  11. any other business

Minutes

  1. Mapping - Tim
    1. preparing mapping instrument for tagger magnet
    2. repairing power supply for the pair spectrometer's magnet
  2. Pair spectrometer - Ivan
    1. all parts are ready except for the fixture of the fibers, working with Chuck on design
    2. working on slow control
  3. Fixed array - Natalie/Franz
    1. received all scintillator bars with light guide glued
    2. checked all of them, most of them are good
    3. working on final design of the holder
  4. Goniometer - Yi
    1. testing goniometer in FEL
    2. verified minimum step sized: 0.2 mdeg in yaw and 0.1 mdeg in pitch
    3. more test on reproducibility and optimize moving parameters
  5. Accelerator Clock - Eugene
    1. trying to order cable for the signal form physics's FY14 budget: 26k for part and 14k for labor
  6. Microscope - Alex B.
    1. production on track, will ship samples to JLab soon
  7. Microscope construction - James
    1. a little bit late on first article, but the whole schedule and budget are still on track
  8. Diamond thinning - Brenden/Jarrod
    1. restarting the thinning process
    2. Jarrod working with Richard on the proposal