Line 11: Line 11:
 
# Update on mapping - ''Tim W.''
 
# Update on mapping - ''Tim W.''
 
# Update on pair spectrometer - ''Ivan T.''
 
# Update on pair spectrometer - ''Ivan T.''
# [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=2294 TAGH counter inspection and testing] - ''Franz K./Natalie W.''
+
# [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=2294 TAGH counter inspection and testing] - ''Franz K./Natalie W.''
 
# Update on goniometer testing - ''Yi Q.''
 
# Update on goniometer testing - ''Yi Q.''
 
# Update on clock signal - ''Eugene C.''
 
# Update on clock signal - ''Eugene C.''
 
# Update on microscope electronics - ''Alex B.''
 
# Update on microscope electronics - ''Alex B.''
# [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=2181 Status of the microscope construction] - ''James M.''
+
# [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=2181 Status of the microscope construction] - ''James M.''
 
# Diamond thinning proposal - ''Brenden/Jarrod F.''
 
# Diamond thinning proposal - ''Brenden/Jarrod F.''
 
#''any other business''
 
#''any other business''
Line 26: Line 26:
 
## all parts are ready except for the fixture of the fibers, working with Chuck on design
 
## all parts are ready except for the fixture of the fibers, working with Chuck on design
 
## working on slow control
 
## working on slow control
# Fixed array - ''Natalie''
+
# Fixed array - ''Natalie/Franz''
 
## received all scintillator bars with light guide glued
 
## received all scintillator bars with light guide glued
 
## checked all of them, most of them are good
 
## checked all of them, most of them are good
 
## working on final design of the holder
 
## working on final design of the holder
 +
# Goniometer - ''Yi''
 +
## testing goniometer in FEL
 +
## verified minimum step sized: 0.2 mdeg in yaw and 0.1 mdeg in pitch
 +
## more test on reproducibility and optimize moving parameters
 +
# Accelerator Clock - ''Eugene''
 +
## trying to order cable for the signal form physics's FY14 budget: 26k for part and 14k for labor
 
# Microscope - ''Alex B.''
 
# Microscope - ''Alex B.''
 
## production on track, will ship samples to JLab soon
 
## production on track, will ship samples to JLab soon
Line 37: Line 43:
 
## restarting the thinning process
 
## restarting the thinning process
 
## Jarrod working with Richard on the proposal
 
## Jarrod working with Richard on the proposal
# Goniometer - ''Yi''
 
## Testing goniometer in FEL
 
## verified minimum step sized: 0.2 mdeg in yaw and 0.1 mdeg in pitch
 
## more test on reproducibility and optimize moving parameters
 
# Accelerator Clock - ''Eugene''
 
## going to order cable for the signal form physics's FY14 budget
 

Latest revision as of 16:54, 24 February 2017

Organization

  • Time: 11:30 EST
  • Place: ESNET and Seevogh (Jlab community)
  • Connecting: instructions are here
  • Present: Natalie W., Jarrod F., Eugene C., Todd S., Ivan T., Tim W., Yi Q., Brenden P., Alex B., Ann C., James M., Curtis M., Franz K.

Agenda

  1. Announcements
  2. October Collaboration Meeting
  3. Update on mapping - Tim W.
  4. Update on pair spectrometer - Ivan T.
  5. TAGH counter inspection and testing - Franz K./Natalie W.
  6. Update on goniometer testing - Yi Q.
  7. Update on clock signal - Eugene C.
  8. Update on microscope electronics - Alex B.
  9. Status of the microscope construction - James M.
  10. Diamond thinning proposal - Brenden/Jarrod F.
  11. any other business

Minutes

  1. Mapping - Tim
    1. preparing mapping instrument for tagger magnet
    2. repairing power supply for the pair spectrometer's magnet
  2. Pair spectrometer - Ivan
    1. all parts are ready except for the fixture of the fibers, working with Chuck on design
    2. working on slow control
  3. Fixed array - Natalie/Franz
    1. received all scintillator bars with light guide glued
    2. checked all of them, most of them are good
    3. working on final design of the holder
  4. Goniometer - Yi
    1. testing goniometer in FEL
    2. verified minimum step sized: 0.2 mdeg in yaw and 0.1 mdeg in pitch
    3. more test on reproducibility and optimize moving parameters
  5. Accelerator Clock - Eugene
    1. trying to order cable for the signal form physics's FY14 budget: 26k for part and 14k for labor
  6. Microscope - Alex B.
    1. production on track, will ship samples to JLab soon
  7. Microscope construction - James
    1. a little bit late on first article, but the whole schedule and budget are still on track
  8. Diamond thinning - Brenden/Jarrod
    1. restarting the thinning process
    2. Jarrod working with Richard on the proposal