Difference between revisions of "BLTWG Meeting 10/04/2010"

From GlueXWiki
Jump to: navigation, search
(Agenda)
 
(7 intermediate revisions by 3 users not shown)
Line 2: Line 2:
 
* Place: ESNET and EVO (with telephone bridge id 2384128)  
 
* Place: ESNET and EVO (with telephone bridge id 2384128)  
 
* Connecting: instructions are [[Tagged Beam Group Biweekly Meetings|here]]
 
* Connecting: instructions are [[Tagged Beam Group Biweekly Meetings|here]]
* Present: Tim W., Dan S., Yi X., Hovannes A., Alex S., Igor S., Brendan P, and Richard J.
+
* Present: Tim W., Dan S., Yi Q., Hovanes E., Alex S., Igor S., Brendan P, and Richard J.
  
 
===Agenda===
 
===Agenda===
Line 8: Line 8:
 
# Report from the Lehmann Review -- ''discussion''
 
# Report from the Lehmann Review -- ''discussion''
 
# Status of the tagger build-to-drawings package -- ''Tim''
 
# Status of the tagger build-to-drawings package -- ''Tim''
# Simulation of background radiation in the tagger hall -- ''Sascha''  
+
# Simulation of background radiation in the tagger hall -- ''Sascha''
# Measurements of Photonique SiPM radiation damage with a source -- ''Yi''
+
#* [[Comparison_of_radiation_damage_between_FLUKA_and_Geant]]
 +
# Measurements of Photonique SiPM radiation damage with a source -- ''Yi''  
 +
#* [[SiPM_Radiation_Hardness_Test]]
 
# Test run plans -- ''discussion''
 
# Test run plans -- ''discussion''
 
#* [[Microscope Prototype Beam Test]] information page
 
#* [[Microscope Prototype Beam Test]] information page
  
 
===Notes===
 
===Notes===

Latest revision as of 11:54, 21 March 2013

  • Time: 11:00 EST
  • Place: ESNET and EVO (with telephone bridge id 2384128)
  • Connecting: instructions are here
  • Present: Tim W., Dan S., Yi Q., Hovanes E., Alex S., Igor S., Brendan P, and Richard J.

Agenda

  1. Report from the Lehmann Review -- discussion
  2. Status of the tagger build-to-drawings package -- Tim
  3. Simulation of background radiation in the tagger hall -- Sascha
  4. Measurements of Photonique SiPM radiation damage with a source -- Yi
  5. Test run plans -- discussion

Notes