Difference between revisions of "BLTWG Meeting 10/16/2008"
From GlueXWiki
(→Agenda) |
|||
Line 13: | Line 13: | ||
<br> | <br> | ||
---- | ---- | ||
+ | |||
+ | ===Action list=== | ||
+ | |||
+ | # First draft of the TDR sections are due by Monday, Oct. 20 to Jim Stewart. Jim will collect the results and build a unified draft document for everyone to review, starting Monday. | ||
+ | # Tagger magnet specs on the wiki are out of date, applying to the two-dipole design. Jim will get the revised specs from Tim and update the wiki page. |
Latest revision as of 11:19, 16 October 2008
- Time: 9:30 EST
- Place: EVO and ESNET (with telephone bridge)
- Connecting: instructions are here
- Present: Jim S., Alex S., Richard J., Dan S., Guangliang Y., Hrachya H., Franz K.
Agenda
- Writing reports - everyone
- Changes to the dry run schedule -- Jim
- Updated tagger drawings - Tim,Franz
- Collimator simulation results - Alexander
- Diamond thickness and multiple scattering update - Richard
Action list
- First draft of the TDR sections are due by Monday, Oct. 20 to Jim Stewart. Jim will collect the results and build a unified draft document for everyone to review, starting Monday.
- Tagger magnet specs on the wiki are out of date, applying to the two-dipole design. Jim will get the revised specs from Tim and update the wiki page.